21.09.2015 Views

Haryana State Agricultural Marketing Board

38.Kaithal - Haryana Marketing Board

38.Kaithal - Haryana Marketing Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Haryana</strong> <strong>State</strong> <strong>Agricultural</strong> <strong>Marketing</strong> <strong>Board</strong><br />

Summary of Road Network<br />

Name of Constituency: Kaithal<br />

Name of Hon'ble MLA:<br />

Shri Randeep Singh Surjewala<br />

Constituency information<br />

Total population : 237652<br />

(2001)<br />

PWD Roads Network:<br />

NH<br />

SH MDR ODR<br />

(Information of PWD road network in the<br />

Constituency may not be very accurate)<br />

Transferred from HSAMB<br />

Total<br />

Area (Sq km): 392.683<br />

0.00<br />

41.65<br />

30.91<br />

167.11<br />

125.84<br />

365.51<br />

HSAMB Roads Chronology:<br />

a) Roads Completed before 1-9-1999 28 roads 64.78 km<br />

b) Roads Completed between 1-9-1999 and 31-3-2005 20 roads 48.71 km<br />

c) Roads Completed after 1-4-2005 15 roads 47.79 km<br />

Total: 63 roads 161.28 km<br />

HSAMB Road Network Status<br />

Completed Roads under Maintenance<br />

No SR envisaged 39 roads 110.04 km<br />

SR Awarded / Unawarded 2 roads 4.54 km<br />

New Construction going on<br />

Sub Total: 41 roads 114.58 km<br />

New Construction - Awarded 1 roads 3.57 km<br />

New Construction - Unawarded 1 roads 4.75 km<br />

Transferred<br />

Sub Total: 2 roads 8.32 km<br />

Transferred to PWD (938 roads) 13 roads 35.05 km<br />

Transferred to PWD (Individual) 1 roads 4.95 km<br />

Transferred to MC 8 roads 6.70 km<br />

Sub Total: 22 roads 46.70 km<br />

Group Total: 65 roads 169.60 km<br />

Monday, January 20, 2014 Kaithal<br />

Page 1 of 20<br />

K


Completed Roads under Maintenance<br />

No SR envisaged<br />

1) H - 94 Kaithal-Kkr Road To Keorak. 4.56 km.<br />

46563 03-May-13<br />

43836 25-Mar-13<br />

37799 27-Nov-12<br />

37681 23-Nov-12<br />

13189 28-Oct-11<br />

4412 14-Sep-11<br />

More patch work required.<br />

Work completed.<br />

S/R Completed & now in good condition.<br />

Wrok completed on 20.11.2012.<br />

Work Plan: Patch (Estimated cost 6 lacs).<br />

Constructed 02/1989. Crust 150mm. PC done in 02/2006, SR<br />

Allotted on 13.05.2011, Only 730m CC in Keorak Phirni taken. CC<br />

completed in september.<br />

2) H - 95 Baba Ladana To P.C. Padla. 2.94 km.<br />

47829 30-May-13<br />

46565 03-May-13<br />

27363 16-Jul-12<br />

5883 21-Sep-11<br />

4413 14-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

Patch work required in AR.<br />

Good condition and patchless<br />

Constructed15.08.92, Crust 150mm. Path 5 Karam SR 27.06.05, C.C.<br />

in 0.43 K.M. in Padla completed on 11.03.07.<br />

170m (Padla) CC and rest 1 layer + PC completed in August,2011 (<br />

was allotted in 5/2011)<br />

3) H - 96 Dhons To Khanoda Leading To Pc At Teek 2.83 km.<br />

46566 03-May-13<br />

27364 16-Jul-12<br />

5844 21-Sep-11<br />

Upgraded by HSAMB.<br />

EE reported road is in good condition and patchless.<br />

Constructed 30.08.90, Crust 150mm. Path 6Karam C.C. 100 m<br />

executed in Dhonse during 08/2007. Upgraded/ widened to 5.50 m<br />

under PMGSY - C.C. 395 m (6.10 m width) & P.C. (in 5.50 m) over<br />

75mm WBM G-III in 5.65 m width + 2 layer of 75mm thick<br />

compacted G-II in 5.80 m width and 250mm thick GSB in a width of<br />

1.30 m both side (widened portion) completed on 31.12.09, Work<br />

Plan- Good condition.<br />

4) H - 97 Dundreheri To Guhna 4.10 km.<br />

46567 03-May-13<br />

27365 16-Jul-12<br />

Good condition except phirni portion.<br />

EE reported road is in good condition and patchless.<br />

Monday, January 20, 2014 Kaithal<br />

Page 2 of 20<br />

K


5845 21-Sep-11<br />

Constructed7.11.90, Crust 150mm. Path 5 Karam SR 20.10.05,<br />

Widened to 5.5m & upgraded under PMGSY through P.W.D. (B&R)<br />

Deptt., Work Plan- Good condition.<br />

5) H - 98 Sirta To Manas. 3.82 km.<br />

47828 30-May-13<br />

46568 03-May-13<br />

27366 16-Jul-12<br />

5884 21-Sep-11<br />

4414 14-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

Patch work required in AR.<br />

EE reported road is in good condition and patchless.<br />

Constructed28.11.91, Crust 150mm, Mettaled Width 3.66m, Path =<br />

5 Karam SR 16.06.05 - C.C. 310 m & P.C., Work Plan - SR alloted on<br />

13.05.11 (Gurmail) in otherthan 8th Priority - C.C. 425 m in Sirta &<br />

Manas and 3085 m P.C. over one S/M layer, E.C. 45.04 Lacs.<br />

1 layer + PC allotted on 13.05.2011 (Gurmail). Layer completed in<br />

August,2011.<br />

6) H - 99 Jaswanti To Balwanti. 1.48 km.<br />

47827 30-May-13<br />

27367 03-May-13<br />

5885 21-Sep-11<br />

4415 14-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

EE reported road is in good condition and patchless.<br />

Constructed26.06.91, Crust 150mm. Path 5 Karam SR 28.09.04 -<br />

C.C. 37 m in Balwanti & P.C. SR completed during 08/2011<br />

(Gurmail) - C.C. 87 m in Balwanti and 1355 m P.C. over one S/M<br />

layer, E.C. 15.87 Lacs.<br />

Constructed-1991, Crust-150 mm. SR alloted on 13.05.2011 to<br />

Gurmail , Provision WBM+PC work completed on 31.08.2011.<br />

7) H - 102 Khurana To Dayora. 3.34 km.<br />

47838 30-May-13<br />

27368 16-Jul-12<br />

24597 07-Jun-12<br />

13193 28-Oct-11<br />

4416 14-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

Constructed31.07.93, Crust 150mm. Path 5 Karam SR 2.08.07 - P.C.<br />

over patches. SR allotted on 13.05.11 completed during 08/2011<br />

(Gurmail) - Premix carpet in patches, E.C. 1.98 Lacs.<br />

SR being taken up by PWD (B&R).<br />

Good condition.<br />

Constructed 1993, Crust-150mm SR allotted on 13.05.2011 to<br />

Gurmail, Provision Patch work completed on 31.8.2011<br />

8) H - 103 Diwal To Chhot 4.21 km.<br />

47843 30-May-13<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

Monday, January 20, 2014 Kaithal<br />

Page 3 of 20<br />

K


146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

46569 03-May-13<br />

43828 25-Mar-13<br />

42280 13-Mar-13<br />

40349 06-Feb-13<br />

27369 16-Jul-12<br />

4417 14-Sep-11<br />

EE reported: Road is patchless.<br />

Work completed on 10.03.2013.<br />

WBM patch work in progress.<br />

A/R work allotted on 30.11.2012 (Sh. Goldy Dhingra).<br />

T/sanction of D/Estimate of A/R on 16.04.12 for Rs. 1.79 lacs.<br />

Constructed 1993, Crust 150mm, 75mm WBM + PC sanctioned on<br />

7/1/2011, allotted on 13/5/2011 (Gurmail). SR of only 100m is<br />

required.<br />

9) H - 105 Baba Ladana-Padla Road To School At Baba Ladana. 0.31 km.<br />

37807 03-May-13<br />

5686 21-Sep-11<br />

EE reported: Road is in Good condition<br />

Constructed 20.05.93, Crust 150mm. Path 5 Karam SR 2.08.07 - PC<br />

over patches, Work Plan - Repair upto @ 44 E.C. 0.14 Lacs.<br />

10) H - 106 Kaithal-Kkr Road To Kathwar. 1.68 km.<br />

47840 30-May-13<br />

46570 03-May-13<br />

45154 12-Apr-13<br />

40350 06-Feb-13<br />

27372 16-Jul-12<br />

27371 16-Jul-12<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

AR required.<br />

AR completed on 31.3.2013. Road is in Good Condition.<br />

A/R work allotted on 12.11.2012 (M/S S.K Contractor)<br />

Constructed 1993, crust 150mm, SR on 2.08.07 CC 148m in<br />

Kathwar, SR allotted on 13.05.11(Gurmail) 300m(1060 to 1360m) in<br />

PC over patches. E/Cost 1.65 lacs completed on 12.11.11<br />

T/sanction of D/Estimate of A/R on 16.04.12 for Rs. 0.60 lacs<br />

11) H - 107 Sirta To Kishan Singh Ki Kui. 1.76 km.<br />

47836 30-May-13<br />

46571 03-May-13<br />

46151 26-Apr-13<br />

27373 16-Jul-12<br />

24601 08-Jun-12<br />

5889 21-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

AR required. (Minor patches).<br />

A/A on 18.04.2013 for Rs. 15.60 lacs.<br />

Work completed on 12.11.11, road is in good condition and<br />

patchless.<br />

SR being taken up by PWD (B&R).<br />

Constructed31.12.93, Crust 150mm. Path 5 Karam SR 31.12.04 -<br />

P.C. over patches. 75mm WBM + PC sanctioned on 7/1/2011,<br />

allotted on 13/5/2011 (Gurmail Singh), E.C. 17.46 Lacs.<br />

Monday, January 20, 2014 Kaithal<br />

Page 4 of 20<br />

K


12) H - 109 Ujhana To Dayora 2.21 km.<br />

27374 16-Jul-12<br />

15681 30-Nov-11<br />

5678 21-Sep-11<br />

EE reported S/R being taken up B&R<br />

Patched (178.67 Sqm) during 21/08/11 to 22/08/11(33K)<br />

Constructed 28.05.94, Crust 150mm. Path 5 Karam, SR -02.08.07 -<br />

PC over patches.<br />

13) H - 110 Sajuma To Diwal. 3.80 km.<br />

60882 06-Jan-14<br />

56169 10-Oct-13<br />

38321 14-Dec-12<br />

5890 21-Sep-11<br />

Work completed.<br />

A/A ,D.E. and rates approved (Krishan Kkumar) amounting to Rs.<br />

54,61,900/- on 1.10.2013.<br />

A/R Completed & now in good condition.<br />

Constructed31.12.93, Crust 150mm. Path 5&10 Karam SR 1.12.06 -<br />

PC over patches, Work Plan - Repair upto @ 44 E.C. 0.70 Lacs.<br />

Work Plan (2013-14): Work Plan: SE proposes 550m pavers rest patches. Estimate cost Rs. 55<br />

lacs.<br />

14) H - 111 Kaithal-Guhla Road To Dera Garja Singh 0.84 km.<br />

47835 30-May-13<br />

13194 03-May-13<br />

27378 16-Jul-12<br />

27377 16-Jul-12<br />

17281 09-Jan-12<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

EE reported: Road is patchless.<br />

Constructed 31.12.95, Crust 150mm. Path 5(3+2) Karam SR<br />

12.07.05 - P.C. over patches.75mm WBM + PC sanctioned on<br />

7/1/2011, allotted on 13/5/2011 (Gurmail Singh), E.C. 8.30 Lacs.<br />

Completed on 12.11.11<br />

EE reported road is in good condition and patchless.<br />

Work completed on 12/11/2011.<br />

15) H - 112 Kathwar To Dhons. 3.83 km.<br />

46573 03-May-13<br />

10853 14-Oct-11<br />

Upgraded by PWD (B&R)<br />

Constructed 27.12.03, Path 5 Karam, Crust 150mm, SR 27.12.03 -<br />

C.C. 467 m, P.C. over patches & R/wall 93 m, Widened to 5.5m &<br />

upgraded under PMGSY through P.W.D. (B&R) Deptt.(Good<br />

condition)<br />

16) H - 114 Geong To Kaithal-Dhand Road Via Dera Chhurimar. 1.95 km.<br />

47834 30-May-13<br />

46574 03-May-13<br />

37906 29-Nov-12<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

More patch work required in 1 km.<br />

Work completed on 28.11.2012.<br />

Monday, January 20, 2014 Kaithal<br />

Page 5 of 20<br />

K


13195 28-Oct-11<br />

5892 21-Sep-11<br />

Work Plan: Patches on the rest of the portion where concrete is not<br />

sanctioned (Estimated cost 6 lacs).<br />

Constructed30.06.97, Crust 150mm. Path 5 Karam SR 15.09.05 -<br />

P.C. over patches. Work Plan - SR alloted on 13.05.11 (Gurmail) in<br />

otherthan 8th priority - C.C. 250 m in Geong, E.C. 8.43 Lacs. Repair<br />

patch work in rest. @> 44 Karam E.C. 6.00 Lacs.<br />

17) H - 115 Barout To Kaithal-Pehowa Road Near 132 Kv Power House Thana. 3.60 km.<br />

47833 30-May-13<br />

46575 03-May-13<br />

31918 28-Aug-12<br />

13196 28-Oct-11<br />

5893 21-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

EE reported: Road is patchless.<br />

SR Completed on 28.8.2012.<br />

Work Plan - paver block 100 m (Barout) & PC in rest (Estimated<br />

cost 28 Lacs).<br />

Constructed15.06.97, Crust 150mm. Path = 5&6 Karam on<br />

20.06.05 - PC over patches.<br />

18) H - 117 Dayora To Keorak-Jaswanti Road 2.66 km.<br />

47830 30-May-13<br />

46576 03-May-13<br />

42282 13-Mar-13<br />

40351 06-Feb-13<br />

27380 16-Jul-12<br />

27379 16-Jul-12<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

More patchwork required.<br />

A/R work in progress.<br />

A/R work allotted on 30.11.2012 (Sh. Goldy Dhingra).<br />

Constructed30.05.97, Crust 150mm. Path 5 Karam, SR 8.12.05 - C.C.<br />

400 m Dayora & P.C., Out of 2.66 km SR with 75mm WBM + PC<br />

sanctioned only from RD 2360 to 2660m on 7/1/2011 in vill.<br />

Jaswanti, allotted on 13/5/2011 (Gurmail Singh), E.C. 2.85 Lacs<br />

completed on 12.11.11<br />

T/s of D/Estimate of A/R on 16.04.12 for Rs. 0.96 lacs.<br />

19) H - 121 Jagdish Pura To Kkr-Dhand Road Leading To Vill. Geong. 2.24 km.<br />

20913 03-May-13<br />

40352 06-Feb-13<br />

27382 16-Jul-12<br />

27381 16-Jul-12<br />

EE reported, road is patchless.<br />

A/R work allotted on 30.11.2012 to Sh. Goldy Dhingra.<br />

Constructed 20.10.02, Path 5 Karam, Crust 150mm, SR 30.04.10 -<br />

C.C. 260 m & P.C. over 75 mm layer WBM, now damage due to<br />

flood, work plan patch will be done upto Rs. 44000/- per km<br />

Technical Sanction of Detail estimate of A/R on 16/4/2012 for Rs.<br />

1.10 lacs.<br />

20) H - 122 Sirta Road To Dera Harbhajan Singh Wala. 0.70 km.<br />

Monday, January 20, 2014 Kaithal<br />

Page 6 of 20<br />

K


20914 03-May-13<br />

42284 13-Mar-13<br />

40353 06-Feb-13<br />

24604 08-Jun-12<br />

5687 21-Sep-11<br />

EE reported, road is patchless.<br />

A/R work in progress.<br />

A/R work allotted on 12.12.2012 to Sh. Goldy.<br />

Technical Sanction of Detail estimate on 16/4/2012 for Rs. 0.34 lacs.<br />

Constructed 15.11.98, Crust 150mm. Path 5(3+2) Karam SR<br />

2.08.07 - PC over patches, Work Plan - Repair upto @ 44 E.C. 0.20<br />

Lacs.<br />

21) H - 123 Kaithal-Dhand Road To Dera Mottewala 0.92 km.<br />

46577 03-May-13<br />

27383 16-Jul-12<br />

10826 14-Oct-11<br />

80 31-Jul-11<br />

Presently road without PC as suncity owner laid layer.<br />

Now road falls in suncity area developer area Kaithal<br />

Constructed 20.03.2000, Path 5 Karam, Crust 150mm, SR 2.08.07 -<br />

P.C. over patches, Taken up by Municipal Committee,<br />

Kaithal.(Good condition)<br />

EE Reported, Road is in Good Condition.<br />

22) H - 126 Deodkheri To Shergarh 1.80 km.<br />

46578 03-May-13<br />

27385 16-Jul-12<br />

27384 16-Jul-12<br />

17279 09-Jan-12<br />

AR required.<br />

Constructed02.06.03, Crust 150mm. Path = 4 Karam SR - NIL, 75mm<br />

WBM + PC sanctioned on 27/10/2010, allotted on 14/7/2011<br />

(Gurmail Singh),E.C. 18.09 Lacs completed on 29.12.11<br />

EE reported road is in good condition and patchless.<br />

Work completed on 29/12/2011.<br />

23) H - 127 Sajuma To Guhna. 3.56 km.<br />

46579 03-May-13<br />

42309 13-Mar-13<br />

40354 06-Feb-13<br />

27386 16-Jul-12<br />

5849 21-Sep-11<br />

Patch work required in AR.<br />

A/R work completed<br />

Work allotted on 12.12.2012 to Sh. Chandi Ram contractor.<br />

T/s of D/Estimate of A/R on 16.04.12 for Rs.1.74 lacs.<br />

Constructed30.12.01, Crust 150mm. Path 5 Karam SR 15.08.09 - PC<br />

over patches, Work Plan- Good condition.<br />

24) H - 129 Franswala To Kaithal 3.90 km.<br />

46580 03-May-13<br />

27388 16-Jul-12<br />

AR required.<br />

Constructed31.10.03, Crust 150mm. Path = 4&7 Karam SR - NIL,<br />

C.C. 400m (RD 100 to 400m in Franswala) and rest 75mm WBM +<br />

PC sanctioned on 27/10/2010, allotted on 14/7/2011 (Gurmail<br />

Singh) , E.C. 43.42 Lacs completed on 29.12.11<br />

Monday, January 20, 2014 Kaithal<br />

Page 7 of 20<br />

K


27387 16-Jul-12<br />

17278 09-Jan-12<br />

EE reported road is in good condition and patchless.<br />

Work completed on 29/12/2011.<br />

25) H - 131 Dayora To Jaswanti 4.55 km.<br />

46581 03-May-13<br />

27390 16-Jul-12<br />

27389 16-Jul-12<br />

17277 09-Jan-12<br />

AR required.<br />

Constructed 28.03.03, Crust 150mm. Path = 5 Karam SR - NIL, CC 0<br />

to 578m in vill. Dayora and 220m in Jaswanti and rest 75mm WBM<br />

+ PC sanctioned on 27/10/2010, allotted on 14/7/2011 (Gurmail<br />

Singh), E.C. 65.94 Lacs completed on 30.11.11<br />

EE reported road is in good condition and patchless.<br />

Work completed on 30/11/2011.<br />

26) H - 135 Khanoda-Pharal-Dhand Road To Shamshan Ghat At Vill. Khanoda. 0.49 km.<br />

46582 03-May-13<br />

45714 18-Apr-13<br />

10829 14-Oct-11<br />

Upgraded by HSAMB.<br />

Transferred back from PWD on 17.4.2013 within a list of 550<br />

(76+474) roads.<br />

Constructed 31.12.01, Path 6 Karam, Crust 150mm, Upgraded/<br />

widened to 5.5m width 31.12.09 under PMGSY with C.C. in 6.10m<br />

width.(Good condition)<br />

27) H - 136 Nauch To Prempura. 2.97 km.<br />

46583 03-May-13<br />

42285 13-Mar-13<br />

40355 06-Feb-13<br />

27391 16-Jul-12<br />

10865 14-Oct-11<br />

EE reported: Road is patchless.<br />

A/R work in progress.<br />

A/R Work allotted on 30.11.2013 to Sh. Goldy Dhingra contractor.<br />

T/s of D/Estimate of A/R on 16.04.12 for Rs.0.97 lacs.<br />

Constructed 8.12.01, Path 5 Karam, Crust 150mm, SR 15.08.09 -<br />

C.C. 980 m in Nauch & Prempura & P.C. over 75 mm layer WBM. (<br />

Good condition)<br />

28) H - 138 Meoli To Dhons 3.68 km.<br />

47841 30-May-13<br />

46584 03-May-13<br />

27392 16-Jul-12<br />

17276 09-Jan-12<br />

17275 09-Jan-12<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

Patchwork required in AR.<br />

EE reported road is in good condition and patchless.<br />

Work completed on 31/10/2011.<br />

Constructed 8/10/2004. Path 5 karam. Crust 150mm. 75mm WBM<br />

+ PC sanctioned on 7/1/2011, allotted on 13/5/2011 (Gurmail<br />

Singh).<br />

Monday, January 20, 2014 Kaithal<br />

Page 8 of 20<br />

K


29) H - 139 Ktl-Ambala Road To Ktl-Kkr Road Leading To Vill. Geong. 3.00 km.<br />

20915 03-May-13<br />

42286 13-Mar-13<br />

40356 06-Feb-13<br />

27395 16-Jul-12<br />

27394 16-Jul-12<br />

EE reported, road is patchless.<br />

A/R work in progress.<br />

A/R Work allotted on 30.11.2012 to Sh. Goldy Dhingra.<br />

Constructed 29.11.01, Crust 150mm. Path 5&6 Karam SR 15.08.09 -<br />

PC over patches, Work Plan - Repair upto @ 44 E.C. 0.90 Lacs<br />

completed on 21.11.11<br />

T/s of D/Estimate of A/R on 16.04.12 for Rs.1.47 lacs.<br />

30) H - 144 Baba Ladana To Garhi 4.53 km.<br />

47842 30-May-13<br />

27396 03-May-13<br />

27397 16-Jul-12<br />

17274 09-Jan-12<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

EE reported road is in good condition and patchless.<br />

Constructed30.11.04, Crust 150mm. Path = 6&4 Karam 75mm<br />

WBM + PC sanctioned on 7/1/2011, allotted on 13/5/2011 (Gurmail<br />

Singh), E.C. 45.56 Lacs completed on 12.11.11<br />

Work completed on 12/11/2011.<br />

31) H - 145 Khurana To Malikpur. 3.80 km.<br />

46585 03-May-13<br />

31917 28-Aug-12<br />

23381 18-May-12<br />

19440 18-Feb-12<br />

5900 21-Sep-11<br />

AR required.<br />

SR Completed on 28.8.2012.<br />

AA on 24/4/2012 for Rs. 5.15 lacs. Work allotted on 26/6/2012 (Sh.<br />

Gurmail Singh).<br />

Approved in work plan D/E sent to S.E. for Rs, 5.19 lacs for<br />

T/approval .<br />

Constructed28.04.08, Crust 150mm. Path 4&6 Karam SR - NIL, Work<br />

Plan - Repair patch work @44 E.C. 6 Lacs.<br />

32) H - 146 Bus Stand Chandana To Rly. Station Kutubpur. 3.40 km.<br />

47831 30-May-13<br />

46586 03-May-13<br />

27399 16-Jul-12<br />

27398 16-Jul-12<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

AR required.<br />

Constructed26.07.05, Crust 150mm. Path = 5 Karam SR - NIL, SR<br />

sanctioned on 7/1/2011 and alloted on 13.05.11 (Gurmail) CC 626<br />

m in vill. Chandana (RD 64 to 690m), rest 75mm WBM + PC (RD 690<br />

to 3516m), CC already exists in RD 0 to 64m in vill.<br />

Chandana,R/Wall 100m in vill. Chandana. EC 57.59 laccompleted<br />

s on 12.11.11<br />

EE reported road is in good condition and patchless.<br />

Monday, January 20, 2014 Kaithal<br />

Page 9 of 20<br />

K


17273 09-Jan-12<br />

Actual Length of the road is 3.52 km.<br />

33) H - 147 Geong To Mundri Via Sampli Kheri. 4.40 km.<br />

47832 30-May-13<br />

46587 03-May-13<br />

27400 16-Jul-12<br />

17271 09-Jan-12<br />

5902 21-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

AR required.<br />

EE reported road is in good condition and patchless.<br />

work completed on 31/10/2011.<br />

Constructed5.05.06, Crust 150mm. Path = 5&6 Karam SR - NIL,CC<br />

over 75mm WBM in 250m (RD 2320 to 2570m in village Sampli<br />

Kheri) and rest 75mm WBM + PC sanctioned on 7/1/2011, allotted<br />

on 13/5/2011 (Gurmail Singh), E.C. 48.69 Lacs.<br />

34) H - 149 Mago Majri To Franswala. 1.72 km.<br />

21612 03-May-13<br />

42287 13-Mar-13<br />

40357 06-Feb-13<br />

27402 16-Jul-12<br />

5689 21-Sep-11<br />

EE reported: Road is patchless.<br />

A/R work in progress.<br />

A/R work allotted on 30.11.2012 to Sh. Goldy Dhingra.<br />

T/s of D/Estimate of A/R on 16.04.12 for Rs.0.84 lacs.<br />

Constructed 29.05.09, Crust 225mm. Path 5 Karam SR - NIL, Work<br />

Plan - Repair upto @ 44 E.C. 0.60 Lacs.<br />

35) H - 150 Guhna To Dilowali. 3.79 km.<br />

46588 03-May-13<br />

42311 13-Mar-13<br />

40358 06-Feb-13<br />

24609 08-Jun-12<br />

21613 02-Apr-12<br />

5690 21-Sep-11<br />

Patch work required in Phirni portion.<br />

A/R work in Progress (WBM patches).<br />

A/R work allotted on 12.12.2012 to Sh. Goldy Dhingra.<br />

Technical Sanction of Detail estimate on 16/4/2012 for Rs. 1.86 lacs.<br />

Road is patchless.<br />

Constructed 1.12.08, Crust 225mm. Path 5&6 Karam SR - NIL, Work<br />

Plan - Repair upto @ 44 E.C. 0.80 Lacs.<br />

36) H - 151 Kultarn To Khurana. 1.70 km.<br />

24610 03-May-13<br />

38322 14-Dec-12<br />

15682 30-Nov-11<br />

5679 21-Sep-11<br />

Edge repair + berm in phirni portion.<br />

A/R Completed & now in good condition.<br />

Patched (164.18 Sqm) during 22/08/11 to 23/08/11(28K)<br />

Constructed 5.03.09, Crust 225mm. Path 4 Karam SR NIL.<br />

Monday, January 20, 2014 Kaithal<br />

Page 10 of 20<br />

K


37) H - 153 Chhot To Franswala Via Bhanpura. 5.66 km.<br />

19443 03-May-13<br />

38323 14-Dec-12<br />

5691 21-Sep-11<br />

Minor patch & berm in phirni portion in Franswala.<br />

A/R Completed & now in good condition.<br />

Constructed 4.09.09, Crust 225mm. Path 5 Karam SR - NIL, Work<br />

Plan - Repair upto @ 44 E.C. 2.50 Lacs.<br />

38) H - 155 Approach Road To Sports Stadium At Village Keorak. 0.13 km.<br />

37808 03-May-13<br />

5852 21-Sep-11<br />

EE reported: Road is in Good condition<br />

Constructed30.04.10, Crust 225mm. Width 5.5m. Path 4 Karam SR -<br />

NIL, Work Plan- Good condition.<br />

39) H - 4538 Budha Khera To Nand Singhwala 3.18 km.<br />

46589 03-May-13<br />

33168 25-Sep-12<br />

24661 08-Jun-12<br />

22419 17-Apr-12<br />

EE reported: Road is patchless.<br />

Work completed.<br />

Length reduced form 3.66 to 3.18 due to paver block by Gram<br />

Panchayat.<br />

Path is 6 karam, Crust 400m, Length 2.20 km, AA 04.08.2011, Amt.<br />

58.42 lacs accorded with on other road Ahun to Sangrouli.Paver<br />

blocks from RD 0 to 460m Bhudda Khera. Alloted on 22.12.2011.<br />

Scheduled dated 30.06.2012. Revised AA for Rs. 119.91 lacs on<br />

05.12.2011 for both roads.<br />

Sub Total:<br />

110.04 km.<br />

SR Awarded<br />

1) H - 130 Deodkheri To Narar. 2.16 km.<br />

60883 06-Jan-14<br />

57694 13-Nov-13<br />

55618 01-Oct-13<br />

54395 01-Sep-13<br />

45715 18-Apr-13<br />

10732 14-Oct-11<br />

8147 03-Oct-11<br />

PC pending.<br />

1km Stone metal laid.<br />

A/A/ amounting to Rs.2376300/- and rate also approved on<br />

24.09.2013. Sh. Gurmail Singh Contractor<br />

Tender to be received on 6.9.13.<br />

Transferred back from PWD on 17.4.2013 within a list of 550<br />

(76+474) roads.<br />

Constructed- 15.01.03, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to PWD. PWD RoadID : 9419<br />

Work Plan (2013-14):<br />

Patches + PC on entire length, cost Rs. 25.00 lacs.<br />

Monday, January 20, 2014 Kaithal<br />

Page 11 of 20<br />

K


2) H - 148 Mundri To Kakout. 2.38 km.<br />

60884 06-Jan-14<br />

57695 13-Nov-13<br />

56174 10-Oct-13<br />

46591 03-May-13<br />

45747 18-Apr-13<br />

10739 14-Oct-11<br />

7742 03-Oct-11<br />

Work allotted on 09.10.2013, paver block laid in 350m.<br />

Tender approved to Sh. Sumit kumar.<br />

Tender approved on 19.09.2013. A/A ,D.E. and rates approved<br />

amounting to Rs. 45,80,600/- on 1.10.2013.<br />

AR required.<br />

Transferred back from PWD on 17.4.2013 within a list of 550<br />

(76+474) roads.<br />

Constructed- 30.05.09, Crust- 225mm, Path- 6 Karam, SR - Nil<br />

Transferred to PWD. PWD RoadID : 9508<br />

Work Plan (2013-14):<br />

Work Plan: SE proposed Paver in 375m Phirni rest patches & Nallah in<br />

100m. Approximately cost 40 lacs.<br />

Sub Total:<br />

4.54 km.<br />

Monday, January 20, 2014 Kaithal<br />

Page 12 of 20<br />

K


New Construction going on<br />

New Construction - Awarded<br />

1) H - 5823 Pilni To Kakaut 3.57 km.<br />

59911 12-Dec-13<br />

53782 30-Aug-13<br />

53781 30-Aug-13<br />

53296 16-Aug-13<br />

50558 03-Jul-13<br />

49749 21-Jun-13<br />

49887 21-Jun-13<br />

42262 13-Mar-13<br />

41708 06-Mar-13<br />

28628 27-Jul-12<br />

27922 20-Jul-12<br />

27666 18-Jul-12<br />

14599 16-Nov-11<br />

E/W complete. GSB in progress.<br />

T/S approved on 14.08.2013.<br />

Tender approved on 14.08.2013 (Sh. Ramdiya Contractor).<br />

Tender approved in favour of sh. Ramdiya contractor<br />

Tender called for 24.07.2013.<br />

A/A accorded for Rs. 1,14,40,000/- on 20.06.13.<br />

A/A on 20.06.2013 for RS. 1.14 crore.<br />

R/C/E already submitted to EIC vide SE Pipli memo no. 1961 dated<br />

22.05.2012 for Rs. 151.41 lacs.<br />

CM has approved the road on 18/2/2013.<br />

CA to PS Agri. no. 410 on 20.07.12<br />

Path over 29'. No distance shortened. Upward of E-In-C.<br />

Demanded by Sh. Sultan Singh Jadoula MLA Pundri on dt<br />

20.04.2012.<br />

Not approved on 23.08.10<br />

Sub Total:<br />

3.57 km.<br />

New Construction - Unawarded<br />

1) H - 5821 Kakout to Sismore 4.75 km.<br />

61629 14-Jan-14<br />

60022 16-Dec-13<br />

58672 08-Nov-13<br />

56630 25-Oct-13<br />

43969 28-Mar-13<br />

25412 16-Jun-12<br />

24669 08-Jun-12<br />

14597 16-Nov-11<br />

Tender recalled due to higher rates.<br />

Tenders received and under process in division office.<br />

Tender to be received on 12/12/2013.<br />

A/A accorded for Rs. 1,60,20,900/- on 25.10.2013.<br />

Hon'ble CM has apporved the road on 18.02.2013.<br />

Width Ok. No distance shortened. Upward from EIC. (Correction on<br />

computer PR).<br />

CM annoucement no. 5347 on 3/4/2012.<br />

Not approved on 23.08.10 earlier.<br />

Sub Total:<br />

4.75 km.<br />

Monday, January 20, 2014 Kaithal<br />

Page 13 of 20<br />

K


Planned - New Construction<br />

PR Upward of Engineer-In-Chief<br />

1) H - 7377 Kurar to Sinand 3.52 km.<br />

61737 15-Jan-14<br />

60489 01-Jan-14<br />

59292 05-Dec-13<br />

P/R sent to PSA vide CA no. 873 dt. 20.12.2013.<br />

PR sent to CA on 20.12.2013.<br />

Request of Gram Panchayat Kurar path is 5 Karam<br />

Sub Total:<br />

3.52 km.<br />

PR with AM Office<br />

1) H - 6984 Dohar to Dayora- Jaswanti road 3.30 km.<br />

52337 29-Jul-13<br />

49670 20-Jun-13<br />

48253 06-Jun-13<br />

Case sent to AM Vide PSA memo no 1642 on 29.07.2013.<br />

PR sent to PSA vide CA memo no. 364 dated 20.06.2013.<br />

Recommended by PWD Minister path is 4,5 & 6 Karam.<br />

Sub Total:<br />

3.30 km.<br />

Monday, January 20, 2014 Kaithal<br />

Page 14 of 20<br />

K


Transferred<br />

Transferred to MC<br />

1) H - 101 Chandana Gate To Ngm Kaithal. 0.89 km.<br />

10867 14-Oct-11<br />

5717 21-Sep-11<br />

Constructed- 28.03.93, Crust- 150mm, Path- 10 Karam, SR - 28.03.99<br />

Transferred to M.C.<br />

2) H - 108 Siwan Gate Power House Kaithal- Guhla Road To Sirta Road. 0.73 km.<br />

10868 14-Oct-11<br />

5718 21-Sep-11<br />

Constructed- 31.12.93, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to M.C.<br />

3) H - 113 Mata Gate Kaithal To Kaithal Guhla Road. 0.48 km.<br />

10869 14-Oct-11<br />

5719 21-Sep-11<br />

Constructed- 11.07.96, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to M.C.<br />

4) H - 116 Devigarh-Deodkheri Road To Kaithal- Jind Road Via Shergarh. 1.16 km.<br />

10870 14-Oct-11<br />

5720 21-Sep-11<br />

Constructed- 31.12.96, Crust- 150mm, Path- 7 Karam, SR - Nil<br />

Transferred to M.C.<br />

5) H - 119 Dhand Road To Karnal Road At Kaithal. 0.75 km.<br />

10871 14-Oct-11<br />

5721 21-Sep-11<br />

Constructed- 14.10.96, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to M.C.<br />

6) H - 124 Ambala Road To Kkr Road At Kaithal. 0.63 km.<br />

10872 14-Oct-11<br />

5722 21-Sep-11<br />

Constructed- 31.07.02, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to M.C.<br />

7) H - 128 Devigarh Road To Karnal Road Via Subash Nagar 1.26 km.<br />

10873 14-Oct-11<br />

Constructed- 30.09.2k, Crust- 150mm, Path- 8 Karam, SR - Nil<br />

Monday, January 20, 2014 Kaithal<br />

Page 15 of 20<br />

K


5723 21-Sep-11<br />

Transferred to M.C.<br />

8) H - 134 Shamshan Ghat Near Civil Hospital To Guhla Road Bye Pass At Kaithal. 0.80 km.<br />

10874 14-Oct-11<br />

5724 21-Sep-11<br />

Constructed- 30.04.02, Crust- 150mm, Path- 9 Karam, SR - Nil<br />

Transferred to M.C.<br />

Sub Total:<br />

6.70 km.<br />

Transferred to PWD (938 roads)<br />

1) H - 100 Chhot To Padla. 1.34 km.<br />

43322 19-Mar-13<br />

10727 14-Oct-11<br />

7743 03-Oct-11<br />

PWD executing / has executed work worth 7.4 lacs.<br />

Constructed- 25.05.92, Crust- 150mm, Path- 6 Karam, SR - 12.04.05<br />

Transferred to PWD. PWD RoadID : 9412<br />

2) H - 104 Teak To Keorak 5.02 km.<br />

43323 19-Mar-13<br />

10728 14-Oct-11<br />

8141 03-Oct-11<br />

PWD executing / has executed work worth 44 lacs.<br />

Constructed- 31.10.93, Crust- 150mm, Path- 6 Karam, SR - 18.01.06<br />

Transferred to PWD. PWD RoadID : 9413<br />

3) H - 118 Keorak-Barout Road To Kaithal- Pehowa Road. 0.53 km.<br />

43324 19-Mar-13<br />

10729 14-Oct-11<br />

7749 03-Oct-11<br />

PWD executing / has executed work worth 65 lacs.<br />

Constructed- 26.09.96, Crust- 150mm, Path- 8 Karam, SR - 2.08.07<br />

Transferred to PWD. PWD RoadID : 9414<br />

4) H - 120 Khanoda To Dhand Road. 3.26 km.<br />

43325 19-Mar-13<br />

10730 14-Oct-11<br />

7746 03-Oct-11<br />

PWD executing / has executed work worth 30 lacs.<br />

Constructed- 28.06.97, Crust- 150mm, Path- 6 Karam, SR - 31.12.09<br />

Transferred to PWD. PWD RoadID : 9415<br />

5) H - 132 Kathwar Road To Vill. Keorak. 3.40 km.<br />

Monday, January 20, 2014 Kaithal<br />

Page 16 of 20<br />

K


43326 19-Mar-13<br />

10733 14-Oct-11<br />

7741 03-Oct-11<br />

PWD executing / has executed work worth 24.71 lacs.<br />

Constructed- 28.03.03, Crust- 150mm, Path- 6&7 Karam, SR -<br />

30.04.10<br />

Transferred to PWD. PWD RoadID : 9893<br />

6) H - 133 Teak To Kathwar. 1.02 km.<br />

43327 19-Mar-13<br />

10734 14-Oct-11<br />

7751 03-Oct-11<br />

PWD executing / has executed work worth 20.94 lacs.<br />

Constructed- 26.11.01, Crust- 150mm, Path- 6 Karam, SR - 15.08.09<br />

Transferred to PWD. PWD RoadID : 9416<br />

7) H - 137 Kathwar Road To Mundri Up To Karnal Road At Vill. Mundri. 0.90 km.<br />

10860 14-Oct-11<br />

7753 03-Oct-11<br />

Constructed- 7.08.02, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to PWD. PWD RoadID : 9418<br />

8) H - 140 Ambala Road To Vill. Dayora. 1.95 km.<br />

10735 14-Oct-11<br />

7748 03-Oct-11<br />

Constructed- 14.06.04, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to PWD. PWD RoadID : 9420<br />

9) H - 141 Geong To Sugar Mill 2.46 km.<br />

10736 14-Oct-11<br />

7752 03-Oct-11<br />

Constructed- 28.06.05, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to PWD. PWD RoadID : 9422<br />

10) H - 142 Budha Khera To Kaithal-Khanouri Road Near Vill. Dilowali 3.81 km.<br />

10737 14-Oct-11<br />

7744 03-Oct-11<br />

Constructed- 6.06.05, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to PWD. PWD RoadID : 9421<br />

11) H - 143 Harsola To Deod Kheri. 4.58 km.<br />

10738 14-Oct-11<br />

7745 03-Oct-11<br />

Constructed- 14.10.05, Crust- 150mm, Path- 6 Karam, SR - Nil<br />

Transferred to PWD. PWD RoadID : 9423<br />

Monday, January 20, 2014 Kaithal<br />

Page 17 of 20<br />

K


12) H - 152 Keorak To Begpur Upto Barout-Thana Road. 4.54 km.<br />

10740 14-Oct-11<br />

7750 03-Oct-11<br />

Constructed- 24.06.09, Crust- 225mm, Path- 6 Karam, SR - Nil<br />

Transferred to PWD. PWD RoadID : 9424<br />

13) H - 154 Khanouda Dhons Chowk To Teek. 2.24 km.<br />

10741 14-Oct-11<br />

7747 03-Oct-11<br />

Constructed- 30.04.10, Crust- 225mm, Path- 6 Karam, SR - Nil<br />

Transferred to PWD. PWD RoadID : 9894<br />

Sub Total:<br />

35.05 km.<br />

Transferred to PWD (Individual)<br />

1) H - 125 Kathwar To Khanoda 4.95 km.<br />

22974 07-May-12<br />

19497 18-Feb-12<br />

16251 28-Dec-11<br />

10731 14-Oct-11<br />

Transferred to PWD. PWD road ID is 9417.<br />

Road transferred to PWD (B&R).<br />

This road was not transferred in list of 951 roads. Hence, till some<br />

other record is found it is HSAMB road. Status to be checked form<br />

EE.<br />

Constructed- 31.05.02, Crust- 150mm, Path- 6&10 Karam, SR -<br />

30.04.10<br />

Sub Total:<br />

4.95 km.<br />

Monday, January 20, 2014 Kaithal<br />

Page 18 of 20<br />

K


Other<br />

Dropped<br />

1) H - 5825 Nand Singhwala to Gill Dhani(Vill. Sanghan) 1.62 km.<br />

19500 18-Feb-12<br />

14601 16-Nov-11<br />

The proposed road covered under const. of road from vill Budha<br />

Khera to Nand singh wala and work in progress road ID 4538,<br />

Length = 3.66km, Length = 3.66km, GSB = 3.18km. In vill. Budha<br />

Khera = 0.48 km.<br />

Sent to Govt. CA no. 49 dated 28.01.11<br />

Sub Total:<br />

1.62 km.<br />

Rejected by Government<br />

1) H - 5816 Francewala to Rly Station Kutubpur 2.33 km.<br />

15875 09-Dec-11<br />

14592 16-Nov-11<br />

Hon'ble C.M. not approved on 23.11.2011 (Due to not falls in<br />

policy).<br />

Filled on 21.01.11 again submitted to Govt. CA no. 394 on 27.07.11<br />

2) H - 5817 Geong to Kaithal 4.30 km.<br />

14593 16-Nov-11<br />

Not approved on 23.08.10<br />

3) H - 5818 Rohera to Pingala 2.80 km.<br />

14594 16-Nov-11<br />

Not approved on 23.08.10<br />

4) H - 5819 Songri to Kamalpur 5.93 km.<br />

14595 16-Nov-11<br />

Not approved on 23.08.10<br />

5) H - 5820 Jakhauli to Kichana 3.22 km.<br />

14596 16-Nov-11<br />

Not approved on 23.08.10<br />

Monday, January 20, 2014 Kaithal<br />

Page 19 of 20<br />

K


6) H - 5822 Sismor to Kaithal Bye pass 6.07 km.<br />

14598 16-Nov-11<br />

Not approved on 23.08.10<br />

7) H - 5828 Habri Power House to Deeg road 1.22 km.<br />

14604 16-Nov-11<br />

Not approved on 21.01.11<br />

8) H - 6168 Manjhala to Nagal Bridge 2.00 km.<br />

39291 20-Dec-12<br />

26455 02-Jul-12<br />

15722 30-Nov-11<br />

Govt. has not approved as per orders dated 13.12.2012.<br />

Path is 6k but, in 1.157 to 1.72 km path is 24'-6". 0.28 km shortened<br />

upward of EIC on 2/7/2012.<br />

Demanded by M.P.Kurukshetra on 1.10.11<br />

9) H - 6598 Kalram to Saran<br />

km.<br />

59186 04-Dec-13<br />

46838 07-May-13<br />

44317 08-Apr-13<br />

39617 27-Dec-12<br />

28459 24-Jul-12<br />

Hon'ble CM has not approved the construction of this road due to<br />

non-availablitity of consolidation path on dated 29.11.2013.<br />

Sent to AM vide PSA memo no. 64 on 28.01.2013<br />

Sent to Govt. vide CA no. 14 dated 7/1/2013.<br />

PR submitted to CA on 27/12/2012. Road does not fall in policy due<br />

to less path i.e 22' wide in RD 1950 to 2800m. A distance of 2.5 km<br />

is shortened to reach PC Kailram.<br />

CM ordered on 27.06.2012 examined and submitted him for orders<br />

urgently.<br />

10) H - 6788 Manas to Garhi Baba Ladhana Road 1.45 km.<br />

59180 04-Dec-13<br />

46839 07-May-13<br />

40201 19-Feb-13<br />

40024 17-Jan-13<br />

Hon'ble CM has not approved the construction of this road due to<br />

non-availablitity of consolidation path on dated 25.11.2013.<br />

Sent to AM vide PSA memo no. 290 on 26.02.2013.<br />

Case sent to Govt. vide CA memo no. 39 dated 31.01.2013. Path<br />

21' 5" entire length, no distance shortened.<br />

MP KKR recommended for const. of this road, path is 21' - 4".<br />

Sub Total:<br />

29.32 km.<br />

Monday, January 20, 2014 Kaithal<br />

Page 20 of 20<br />

K

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!