Haryana State Agricultural Marketing Board
38.Kaithal - Haryana Marketing Board
38.Kaithal - Haryana Marketing Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
17273 09-Jan-12<br />
Actual Length of the road is 3.52 km.<br />
33) H - 147 Geong To Mundri Via Sampli Kheri. 4.40 km.<br />
47832 30-May-13<br />
46587 03-May-13<br />
27400 16-Jul-12<br />
17271 09-Jan-12<br />
5902 21-Sep-11<br />
RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />
146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />
AR required.<br />
EE reported road is in good condition and patchless.<br />
work completed on 31/10/2011.<br />
Constructed5.05.06, Crust 150mm. Path = 5&6 Karam SR - NIL,CC<br />
over 75mm WBM in 250m (RD 2320 to 2570m in village Sampli<br />
Kheri) and rest 75mm WBM + PC sanctioned on 7/1/2011, allotted<br />
on 13/5/2011 (Gurmail Singh), E.C. 48.69 Lacs.<br />
34) H - 149 Mago Majri To Franswala. 1.72 km.<br />
21612 03-May-13<br />
42287 13-Mar-13<br />
40357 06-Feb-13<br />
27402 16-Jul-12<br />
5689 21-Sep-11<br />
EE reported: Road is patchless.<br />
A/R work in progress.<br />
A/R work allotted on 30.11.2012 to Sh. Goldy Dhingra.<br />
T/s of D/Estimate of A/R on 16.04.12 for Rs.0.84 lacs.<br />
Constructed 29.05.09, Crust 225mm. Path 5 Karam SR - NIL, Work<br />
Plan - Repair upto @ 44 E.C. 0.60 Lacs.<br />
35) H - 150 Guhna To Dilowali. 3.79 km.<br />
46588 03-May-13<br />
42311 13-Mar-13<br />
40358 06-Feb-13<br />
24609 08-Jun-12<br />
21613 02-Apr-12<br />
5690 21-Sep-11<br />
Patch work required in Phirni portion.<br />
A/R work in Progress (WBM patches).<br />
A/R work allotted on 12.12.2012 to Sh. Goldy Dhingra.<br />
Technical Sanction of Detail estimate on 16/4/2012 for Rs. 1.86 lacs.<br />
Road is patchless.<br />
Constructed 1.12.08, Crust 225mm. Path 5&6 Karam SR - NIL, Work<br />
Plan - Repair upto @ 44 E.C. 0.80 Lacs.<br />
36) H - 151 Kultarn To Khurana. 1.70 km.<br />
24610 03-May-13<br />
38322 14-Dec-12<br />
15682 30-Nov-11<br />
5679 21-Sep-11<br />
Edge repair + berm in phirni portion.<br />
A/R Completed & now in good condition.<br />
Patched (164.18 Sqm) during 22/08/11 to 23/08/11(28K)<br />
Constructed 5.03.09, Crust 225mm. Path 4 Karam SR NIL.<br />
Monday, January 20, 2014 Kaithal<br />
Page 10 of 20<br />
K