21.09.2015 Views

Haryana State Agricultural Marketing Board

38.Kaithal - Haryana Marketing Board

38.Kaithal - Haryana Marketing Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

17273 09-Jan-12<br />

Actual Length of the road is 3.52 km.<br />

33) H - 147 Geong To Mundri Via Sampli Kheri. 4.40 km.<br />

47832 30-May-13<br />

46587 03-May-13<br />

27400 16-Jul-12<br />

17271 09-Jan-12<br />

5902 21-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

AR required.<br />

EE reported road is in good condition and patchless.<br />

work completed on 31/10/2011.<br />

Constructed5.05.06, Crust 150mm. Path = 5&6 Karam SR - NIL,CC<br />

over 75mm WBM in 250m (RD 2320 to 2570m in village Sampli<br />

Kheri) and rest 75mm WBM + PC sanctioned on 7/1/2011, allotted<br />

on 13/5/2011 (Gurmail Singh), E.C. 48.69 Lacs.<br />

34) H - 149 Mago Majri To Franswala. 1.72 km.<br />

21612 03-May-13<br />

42287 13-Mar-13<br />

40357 06-Feb-13<br />

27402 16-Jul-12<br />

5689 21-Sep-11<br />

EE reported: Road is patchless.<br />

A/R work in progress.<br />

A/R work allotted on 30.11.2012 to Sh. Goldy Dhingra.<br />

T/s of D/Estimate of A/R on 16.04.12 for Rs.0.84 lacs.<br />

Constructed 29.05.09, Crust 225mm. Path 5 Karam SR - NIL, Work<br />

Plan - Repair upto @ 44 E.C. 0.60 Lacs.<br />

35) H - 150 Guhna To Dilowali. 3.79 km.<br />

46588 03-May-13<br />

42311 13-Mar-13<br />

40358 06-Feb-13<br />

24609 08-Jun-12<br />

21613 02-Apr-12<br />

5690 21-Sep-11<br />

Patch work required in Phirni portion.<br />

A/R work in Progress (WBM patches).<br />

A/R work allotted on 12.12.2012 to Sh. Goldy Dhingra.<br />

Technical Sanction of Detail estimate on 16/4/2012 for Rs. 1.86 lacs.<br />

Road is patchless.<br />

Constructed 1.12.08, Crust 225mm. Path 5&6 Karam SR - NIL, Work<br />

Plan - Repair upto @ 44 E.C. 0.80 Lacs.<br />

36) H - 151 Kultarn To Khurana. 1.70 km.<br />

24610 03-May-13<br />

38322 14-Dec-12<br />

15682 30-Nov-11<br />

5679 21-Sep-11<br />

Edge repair + berm in phirni portion.<br />

A/R Completed & now in good condition.<br />

Patched (164.18 Sqm) during 22/08/11 to 23/08/11(28K)<br />

Constructed 5.03.09, Crust 225mm. Path 4 Karam SR NIL.<br />

Monday, January 20, 2014 Kaithal<br />

Page 10 of 20<br />

K

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!