Completed Roads under Maintenance<br />

No SR envisaged<br />

1) H - 94 Kaithal-Kkr Road To Keorak. 4.56 km.<br />

46563 03-May-13<br />

43836 25-Mar-13<br />

37799 27-Nov-12<br />

37681 23-Nov-12<br />

13189 28-Oct-11<br />

4412 14-Sep-11<br />

More patch work required.<br />

Work completed.<br />

S/R Completed & now in good condition.<br />

Wrok completed on 20.11.2012.<br />

Work Plan: Patch (Estimated cost 6 lacs).<br />

Constructed 02/1989. Crust 150mm. PC done in 02/2006, SR<br />

Allotted on 13.05.2011, Only 730m CC in Keorak Phirni taken. CC<br />

completed in september.<br />

2) H - 95 Baba Ladana To P.C. Padla. 2.94 km.<br />

47829 30-May-13<br />

46565 03-May-13<br />

27363 16-Jul-12<br />

5883 21-Sep-11<br />

4413 14-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

Patch work required in AR.<br />

Good condition and patchless<br />

Constructed15.08.92, Crust 150mm. Path 5 Karam SR 27.06.05, C.C.<br />

in 0.43 K.M. in Padla completed on 11.03.07.<br />

170m (Padla) CC and rest 1 layer + PC completed in August,2011 (<br />

was allotted in 5/2011)<br />

3) H - 96 Dhons To Khanoda Leading To Pc At Teek 2.83 km.<br />

46566 03-May-13<br />

27364 16-Jul-12<br />

5844 21-Sep-11<br />

Upgraded by HSAMB.<br />

EE reported road is in good condition and patchless.<br />

Constructed 30.08.90, Crust 150mm. Path 6Karam C.C. 100 m<br />

executed in Dhonse during 08/2007. Upgraded/ widened to 5.50 m<br />

under PMGSY - C.C. 395 m (6.10 m width) & P.C. (in 5.50 m) over<br />

75mm WBM G-III in 5.65 m width + 2 layer of 75mm thick<br />

compacted G-II in 5.80 m width and 250mm thick GSB in a width of<br />

1.30 m both side (widened portion) completed on 31.12.09, Work<br />

Plan- Good condition.<br />

4) H - 97 Dundreheri To Guhna 4.10 km.<br />

46567 03-May-13<br />

27365 16-Jul-12<br />

Good condition except phirni portion.<br />

EE reported road is in good condition and patchless.<br />

Monday, January 20, 2014 Kaithal<br />

Page 2 of 20<br />