146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />
46569 03-May-13<br />
43828 25-Mar-13<br />
42280 13-Mar-13<br />
40349 06-Feb-13<br />
27369 16-Jul-12<br />
4417 14-Sep-11<br />
EE reported: Road is patchless.<br />
Work completed on 10.03.2013.<br />
WBM patch work in progress.<br />
A/R work allotted on 30.11.2012 (Sh. Goldy Dhingra).<br />
T/sanction of D/Estimate of A/R on 16.04.12 for Rs. 1.79 lacs.<br />
Constructed 1993, Crust 150mm, 75mm WBM + PC sanctioned on<br />
7/1/2011, allotted on 13/5/2011 (Gurmail). SR of only 100m is<br />
required.<br />
9) H - 105 Baba Ladana-Padla Road To School At Baba Ladana. 0.31 km.<br />
37807 03-May-13<br />
5686 21-Sep-11<br />
EE reported: Road is in Good condition<br />
Constructed 20.05.93, Crust 150mm. Path 5 Karam SR 2.08.07 - PC<br />
over patches, Work Plan - Repair upto @ 44 E.C. 0.14 Lacs.<br />
10) H - 106 Kaithal-Kkr Road To Kathwar. 1.68 km.<br />
47840 30-May-13<br />
46570 03-May-13<br />
45154 12-Apr-13<br />
40350 06-Feb-13<br />
27372 16-Jul-12<br />
27371 16-Jul-12<br />
RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />
146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />
AR required.<br />
AR completed on 31.3.2013. Road is in Good Condition.<br />
A/R work allotted on 12.11.2012 (M/S S.K Contractor)<br />
Constructed 1993, crust 150mm, SR on 2.08.07 CC 148m in<br />
Kathwar, SR allotted on 13.05.11(Gurmail) 300m(1060 to 1360m) in<br />
PC over patches. E/Cost 1.65 lacs completed on 12.11.11<br />
T/sanction of D/Estimate of A/R on 16.04.12 for Rs. 0.60 lacs<br />
11) H - 107 Sirta To Kishan Singh Ki Kui. 1.76 km.<br />
47836 30-May-13<br />
46571 03-May-13<br />
46151 26-Apr-13<br />
27373 16-Jul-12<br />
24601 08-Jun-12<br />
5889 21-Sep-11<br />
RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />
146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />
AR required. (Minor patches).<br />
A/A on 18.04.2013 for Rs. 15.60 lacs.<br />
Work completed on 12.11.11, road is in good condition and<br />
patchless.<br />
SR being taken up by PWD (B&R).<br />
Constructed31.12.93, Crust 150mm. Path 5 Karam SR 31.12.04 -<br />
P.C. over patches. 75mm WBM + PC sanctioned on 7/1/2011,<br />
allotted on 13/5/2011 (Gurmail Singh), E.C. 17.46 Lacs.<br />