Haryana State Agricultural Marketing Board
38.Kaithal - Haryana Marketing Board
38.Kaithal - Haryana Marketing Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
27387 16-Jul-12<br />
17278 09-Jan-12<br />
EE reported road is in good condition and patchless.<br />
Work completed on 29/12/2011.<br />
25) H - 131 Dayora To Jaswanti 4.55 km.<br />
46581 03-May-13<br />
27390 16-Jul-12<br />
27389 16-Jul-12<br />
17277 09-Jan-12<br />
AR required.<br />
Constructed 28.03.03, Crust 150mm. Path = 5 Karam SR - NIL, CC 0<br />
to 578m in vill. Dayora and 220m in Jaswanti and rest 75mm WBM<br />
+ PC sanctioned on 27/10/2010, allotted on 14/7/2011 (Gurmail<br />
Singh), E.C. 65.94 Lacs completed on 30.11.11<br />
EE reported road is in good condition and patchless.<br />
Work completed on 30/11/2011.<br />
26) H - 135 Khanoda-Pharal-Dhand Road To Shamshan Ghat At Vill. Khanoda. 0.49 km.<br />
46582 03-May-13<br />
45714 18-Apr-13<br />
10829 14-Oct-11<br />
Upgraded by HSAMB.<br />
Transferred back from PWD on 17.4.2013 within a list of 550<br />
(76+474) roads.<br />
Constructed 31.12.01, Path 6 Karam, Crust 150mm, Upgraded/<br />
widened to 5.5m width 31.12.09 under PMGSY with C.C. in 6.10m<br />
width.(Good condition)<br />
27) H - 136 Nauch To Prempura. 2.97 km.<br />
46583 03-May-13<br />
42285 13-Mar-13<br />
40355 06-Feb-13<br />
27391 16-Jul-12<br />
10865 14-Oct-11<br />
EE reported: Road is patchless.<br />
A/R work in progress.<br />
A/R Work allotted on 30.11.2013 to Sh. Goldy Dhingra contractor.<br />
T/s of D/Estimate of A/R on 16.04.12 for Rs.0.97 lacs.<br />
Constructed 8.12.01, Path 5 Karam, Crust 150mm, SR 15.08.09 -<br />
C.C. 980 m in Nauch & Prempura & P.C. over 75 mm layer WBM. (<br />
Good condition)<br />
28) H - 138 Meoli To Dhons 3.68 km.<br />
47841 30-May-13<br />
46584 03-May-13<br />
27392 16-Jul-12<br />
17276 09-Jan-12<br />
17275 09-Jan-12<br />
RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />
146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />
Patchwork required in AR.<br />
EE reported road is in good condition and patchless.<br />
Work completed on 31/10/2011.<br />
Constructed 8/10/2004. Path 5 karam. Crust 150mm. 75mm WBM<br />
+ PC sanctioned on 7/1/2011, allotted on 13/5/2011 (Gurmail<br />
Singh).<br />
Monday, January 20, 2014 Kaithal<br />
Page 8 of 20<br />