13195 28-Oct-11<br />

5892 21-Sep-11<br />

Work Plan: Patches on the rest of the portion where concrete is not<br />

sanctioned (Estimated cost 6 lacs).<br />

Constructed30.06.97, Crust 150mm. Path 5 Karam SR 15.09.05 -<br />

P.C. over patches. Work Plan - SR alloted on 13.05.11 (Gurmail) in<br />

otherthan 8th priority - C.C. 250 m in Geong, E.C. 8.43 Lacs. Repair<br />

patch work in rest. @> 44 Karam E.C. 6.00 Lacs.<br />

17) H - 115 Barout To Kaithal-Pehowa Road Near 132 Kv Power House Thana. 3.60 km.<br />

47833 30-May-13<br />

46575 03-May-13<br />

31918 28-Aug-12<br />

13196 28-Oct-11<br />

5893 21-Sep-11<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

EE reported: Road is patchless.<br />

SR Completed on 28.8.2012.<br />

Work Plan - paver block 100 m (Barout) & PC in rest (Estimated<br />

cost 28 Lacs).<br />

Constructed15.06.97, Crust 150mm. Path = 5&6 Karam on<br />

20.06.05 - PC over patches.<br />

18) H - 117 Dayora To Keorak-Jaswanti Road 2.66 km.<br />

47830 30-May-13<br />

46576 03-May-13<br />

42282 13-Mar-13<br />

40351 06-Feb-13<br />

27380 16-Jul-12<br />

27379 16-Jul-12<br />

RAA on 27/5/2013 for Rs. 443.54 lacs for group (99, 98, 95,117,<br />

146, 147, 132, 114, 111, 107, 102, 292, 138, 144 & 103)<br />

More patchwork required.<br />

A/R work in progress.<br />

A/R work allotted on 30.11.2012 (Sh. Goldy Dhingra).<br />

Constructed30.05.97, Crust 150mm. Path 5 Karam, SR 8.12.05 - C.C.<br />

400 m Dayora & P.C., Out of 2.66 km SR with 75mm WBM + PC<br />

sanctioned only from RD 2360 to 2660m on 7/1/2011 in vill.<br />

Jaswanti, allotted on 13/5/2011 (Gurmail Singh), E.C. 2.85 Lacs<br />

completed on 12.11.11<br />

T/s of D/Estimate of A/R on 16.04.12 for Rs. 0.96 lacs.<br />

19) H - 121 Jagdish Pura To Kkr-Dhand Road Leading To Vill. Geong. 2.24 km.<br />

20913 03-May-13<br />

40352 06-Feb-13<br />

27382 16-Jul-12<br />

27381 16-Jul-12<br />

EE reported, road is patchless.<br />

A/R work allotted on 30.11.2012 to Sh. Goldy Dhingra.<br />

Constructed 20.10.02, Path 5 Karam, Crust 150mm, SR 30.04.10 -<br />

C.C. 260 m & P.C. over 75 mm layer WBM, now damage due to<br />

flood, work plan patch will be done upto Rs. 44000/- per km<br />

Technical Sanction of Detail estimate of A/R on 16/4/2012 for Rs.<br />

1.10 lacs.<br />

20) H - 122 Sirta Road To Dera Harbhajan Singh Wala. 0.70 km.<br />

Monday, January 20, 2014 Kaithal<br />