Haryana State Agricultural Marketing Board
13.Panchkula - Haryana Marketing Board
13.Panchkula - Haryana Marketing Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
60439 31-Dec-13<br />
60270 21-Dec-13<br />
56612 24-Oct-13<br />
50990 04-Jul-13<br />
44630 09-Apr-13<br />
31800 23-Aug-12<br />
18088 14-Feb-12<br />
14070 02-Nov-11<br />
10991 14-Oct-11<br />
D/E sanctioned for Rs. 84,54,164/-. (5th priority)<br />
D/E tech. sanctioned for Rs. 8454164/- for a group of 1724, 1712,<br />
1725, 1726, 1714, 1727, 1715, 1716, 1717, 1718, 1719, 1720, 1721,<br />
1722 & 1723.<br />
EE reported: Road transter to MC on 23.10.2013.<br />
E.O./Xen, MC requested to take over this road but not taken over<br />
so far. However AR work for 2013-14 allotted on 29/5/2013.<br />
Road is in good condition.<br />
Under transfer to MC.<br />
E.E reported road is patchless.<br />
(32 sqm) patches done from 21/10/2011 to 23/10/2011<br />
(Expenditure 6K).<br />
Constructed 1996. Path 4 karam. Crust 150mm. Patch + PC in<br />
6/2009.<br />
12) H - 1728 Main Road To Shukhdarshanpur Panchkula<br />
1.12 km.<br />
56608 24-Oct-13<br />
44585 09-Apr-13<br />
43769 25-Mar-13<br />
40848 13-Feb-13<br />
31780 23-Aug-12<br />
22026 04-Apr-12<br />
18384 17-Feb-12<br />
10923 30-Jul-11<br />
EE reported: Road transter to MC on 22.10.2013.<br />
Patch work completed on 23.03.13 in AR 2012-13. Exp. 0.82 lacs.<br />
Patch work completed on 23.03.2013 in A/R.<br />
Taken in A/R 2012-13 in the year 2013-14.<br />
Road is mortorable condition, small patch work is being taken in<br />
A/R.<br />
EE reported, road is patchless.<br />
WBM patches done. PC patches left due to cold weather will be<br />
completed upto 15.03.2012<br />
Constructed 2001. Path 4 karam. Crust 150mm. PC done 6/2009.<br />
Patch work required (EC 50 K)<br />
13) H - 1739 Billa To Assrewali. Panchkula<br />
0.50 km.<br />
56609 24-Oct-13<br />
44595 09-Apr-13<br />
40858 13-Feb-13<br />
10969 30-Jul-11<br />
EE reported: Road transter to MC on 21.10.2013.<br />
Patch work completed on 18.03.13 in AR 2012-13. Exp. 0.61 lacs.<br />
Taken in A/R 2012-13.<br />
Constructed 1994. Path 4 karam. Crust 150mm. PC done in 8/2011.<br />
No patch.<br />
14) H - 1744 Kalka Bargodam Road To Majra Mehtab. Kalka<br />
0.16 km.<br />
56613 24-Oct-13<br />
44600 09-Apr-13<br />
39991 16-Jan-13<br />
37991 07-Dec-12<br />
33224 25-Sep-12<br />
10974 30-Jul-11<br />
EE reported: Road transter to MC on 23.10.2013.<br />
S/R in 8th priority completed on 05.12.12. Exp. 1.46 lacs<br />
P.C completed in 160mtr.<br />
work completed on 05.12.2012.<br />
Work allotted to Sh. Gulshan Kumar, work not allotted E.M.<br />
forfeated & tender was received on 30.09.2012<br />
Constructed 1994. Path 4 karam. Crust 150m. Patch + PC<br />
sanctioned on 27/9/2010. Work yet to be done. Tender received.<br />
Recalled patches be done first (E/C 1.15 lacs).<br />
15) H - 1746 National Highway To Village Kisangarh Panchkula<br />
0.18 km.<br />
56605 24-Oct-13<br />
EE reported: Road transter to MC on 22.10.2013.<br />
Monday, January 20, 2014 Page 20 of 24