Installation/Location State Cat.<br />
237 Vandenberg AFB CA O<br />
238 Vandenberg AFB CA E<br />
239 Vandenberg AFB CA O<br />
240 Vandenberg AFB CA Q<br />
241 Vandenberg AFB CA O<br />
242 Vandenberg AFB CA O<br />
243 Vandenberg AFB CA E<br />
244 Vandenberg AFB CA E<br />
245 Vandenberg AFB CA E<br />
246 Vandenberg AFB CA E<br />
247 Vandenberg AFB CA O<br />
248 Vandenberg AFB CA R<br />
249 Vandenberg AFB CA E<br />
250 Vandenberg AFB CA O<br />
251 Vandenberg AFB CA Q<br />
252 Vandenberg AFB CA E<br />
253 Vandenberg AFB CA Q<br />
Construction<br />
Cost Contract<br />
Construction<br />
Project<br />
Estimate Award Construction Completion<br />
Number Project Title<br />
($000) Date Start Date Date<br />
XUMU111031<br />
C<br />
Install Ceiling Fans, Bldg. 13135 36 Jun-09 Aug-09 Nov-09<br />
XUMU091285<br />
C<br />
Repair/Replace Uninterruptable Power Supply, Bldg 8401 43 Jun-09 Jul-09 May-10<br />
XUMU951041<br />
C<br />
Construct Storage at Fire Station #1 54 May-09 Jul-09 Sep-09<br />
XUMU091176<br />
B<br />
Repair Ladies Restroom, Bldg 9320 70 May-09 May-09 Aug-09<br />
XUMU071224<br />
C<br />
Repair Fence and Install Cable Barrier at Coast Gate 86 Jul-09 Jan-10 May-10<br />
XUMU081484<br />
A1<br />
Maintain San Antonio Creek Environmental Monitoring Ph 1 99 May-09 Jun-09 Jun-10<br />
XUMU071124<br />
B<br />
Replace Taxiway Lights at South Alpha Taxiway 100 Apr-09 May-09 Feb-10<br />
XUMU091286<br />
C<br />
Install Communications Room A/C, Bldg 8401 108 May-09 Aug-09 Oct-09<br />
XUMU091090<br />
B<br />
Repair Missile/Space Research Lab, Bldg 7408 111 May-09 May-09 Aug-09<br />
XUMU091119<br />
B<br />
Replace Chiller 1 at Administrative Bldg 8500 119 May-09 Jun-09 Sep-09<br />
XUMU111061<br />
B<br />
Repair Fitness Center, Bldg 9005 132 May-09 May-09 Jul-09<br />
XUMU081439<br />
B<br />
Replace Roof at Material Supply, Bldg 11152 136 May-09 Jun-09 Sep-09<br />
XUMX071298<br />
D<br />
Corrosion Control Antenna Farm 138 May-09 Aug-09 Dec-09<br />
XUMU951314<br />
B<br />
Repair Comm Ground Tracking Radar Facility 154 May-09 Aug-09 Jun-10<br />
XUMU071235<br />
B<br />
Renovate Men's and Women's Restrooms, Bldg 6523 198 May-09 Jun-09 Sep-09<br />
XUMU061008<br />
B1<br />
Upgrade Feeder Cable, South-V Power Plant 215 Jul-09 Mar-10 Apr-10<br />
XUMU131022<br />
B<br />
Replace Kitchen Floor, Bldg 13330 215 Jun-09 Jul-09 Jul-09<br />
(1) Gap in project numbers results from project cancellations<br />
(2) Estimated construction dates are in plain text, actual construction dates are in italics<br />
(3) The projects listed represent those in the program as of 31 March 2010<br />
(4) As this annual update was done in May, any actual dates between 01 April 2010 and May 2010 are identified as actual dates<br />