facilities sustainment, restoration, & modernization plan
facilities sustainment, restoration, & modernization plan
facilities sustainment, restoration, & modernization plan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DEPARTMENT OF DEFENSE / RECOVERY ACT<br />
FACILITIES SUSTAINMENT, RESTORATION, & MODERNIZATION PLAN – ATTACHMENT A<br />
Installation/Location State Cat.<br />
Project<br />
Number Project Title<br />
Cost<br />
Estimate<br />
($000)<br />
Contract<br />
Award<br />
Date<br />
Construction<br />
Construction<br />
Start Date<br />
Construction<br />
Completion<br />
Date<br />
1450 Francis E Warren AFB WY O GHLN081063 Construct Exersize and Evaluation Cell Admin Bldg 1151 11 Sep-09 Nov-09 Jan-10<br />
1451 Francis E Warren AFB WY O GHLN081068 Construct Office Gate 2 POV Inspection Facility Bldg 530 16 Apr-09 Apr-09 Apr-09<br />
1452 Francis E Warren AFB WY E GHLN091052 Construct/Install Block Heater Receptacles Bldg 1270 16 Jun-09 Aug-09 Oct-09<br />
1453 Francis E Warren AFB WY O GHLN085002 Construct Ada Ramp at Youth Facility Bldg 235 22 May-09 Aug-09 Nov-09<br />
1454 Francis E Warren AFB WY E GHLN091034 Maintain Metal Appurtenances / Switch Gear Basewide 54 Jun-09 Jul-09 Jan-10<br />
1455 Francis E Warren AFB WY O GHLN091024 Repair Kitchen Floor Drains Base Dining Facility Bldg 81 Apr-09 Apr-09 May-09<br />
1456 Francis E Warren AFB WY E<br />
1457 Francis E Warren AFB WY E<br />
GHLN061065<br />
B<br />
GHLN061065<br />
C<br />
Maintain Cathodic Protection Systems Missile Sites 108 Jun-09 Sep-09 Sep-09<br />
Maintain Cathodic Protection Systems Missile Sites 108 Jun-09 Sep-09 Sep-09<br />
1458 Francis E Warren AFB WY O GHLN081047 Repair Close Quarter Combat Trn Facility Bldg 1260 108 Sep-09 Dec-09 Mar-10<br />
1459 Francis E Warren AFB WY E GHLN081088 Install Parking Lot Lighting Bldg 250 108 Sep-09 Nov-09 Oct-10<br />
1460 Francis E Warren AFB WY O GHLN091033 Construct Generator Screening Base Wide 108 Jun-09 Jul-09 Oct-09<br />
1461 Francis E Warren AFB WY R GHLN082007 Repair Roofs MMII Missile Alert Facility C-01, D-01, I- 01 140 Jun-09 Jun-10 Nov-10<br />
1462 Francis E Warren AFB WY R GHLN082008 Repair Roofs MMII Missile Alert Facility F-01, J-01, O-01 145 Jun-09 Jun-10 Nov-10<br />
1463 Francis E Warren AFB WY O GHLN081074<br />
Repair Flooring Replace Carpet Base Child Development Ctr<br />
Bldg 465<br />
162 May-09 Jul-09 Dec-09<br />
1465 Francis E Warren AFB WY O GHLN091035<br />
Construct Target Storage Fac Outdoor Firing Range Bldg<br />
1591<br />
162 Mar-10 Jun-10 Nov-10<br />
1466 Francis E Warren AFB WY E GHLN092006 Repair Sump Pump Equip (Launch Facilitys) 162 Jun-09 Sep-09 Jun-10<br />
1467 Francis E Warren AFB WY P GHLN081002 Maintain Striping, Base Pavements 269 Jun-09 Sep-09 Jun-10<br />
1468 Francis E Warren AFB WY P GHLN091030 Expand CDC Parking Lot Bldg 465 269 Jun-09 Jul-09 May-10<br />
1469 Francis E Warren AFB WY P GHLN092001 Maintain/Seal Missile Alert Facility Asphalt (F01-O01) 269 Jun-09 Oct-09 May-10<br />
1470 Francis E Warren AFB WY Q GHLN051060 Repair Mech Room/Replace Windows Aquatic Ctr Bldg 217 323 Jul-09 Sep-09 May-10<br />
1471 Francis E Warren AFB WY O GHLN071088 Repair Engineering Sectrion, Civil Engineering HQ Bldg 320 323 Nov-09 Nov-09 May-10<br />
(1) Gap in project numbers results from project cancellations<br />
(2) Estimated construction dates are in plain text, actual construction dates are in italics<br />
(3) The projects listed represent those in the program as of 31 March 2010<br />
(4) As this annual update was done in May, any actual dates between 01 April 2010 and May 2010 are identified as actual dates<br />
Attachment A – Page 200 of 225