DEPARTMENT OF DEFENSE / RECOVERY ACT<br />

FACILITIES SUSTAINMENT, RESTORATION, & MODERNIZATION PLAN – ATTACHMENT A<br />

Installation/Location State Cat.<br />

254 Vandenberg AFB CA E<br />

255 Vandenberg AFB CA O<br />

256 Vandenberg AFB CA E<br />

257 Vandenberg AFB CA E<br />

258 Vandenberg AFB CA P<br />

259 Vandenberg AFB CA P<br />

260 Vandenberg AFB CA E<br />

261 Vandenberg AFB CA E<br />

262 Vandenberg AFB CA P<br />

263 Vandenberg AFB CA P<br />

264 Vandenberg AFB CA R<br />

265 Vandenberg AFB CA O<br />

266 Vandenberg AFB CA R<br />

267 Vandenberg AFB CA E<br />

268 Vandenberg AFB CA P<br />

269 Vandenberg AFB CA E<br />

270 Vandenberg AFB CA P<br />

Cost Contract<br />

Construction<br />

Project<br />

Estimate Award Construction Completion<br />

Number Project Title<br />

($000) Date Start Date Date<br />

XUMU081157<br />

B<br />

Replace HVAC Unit, Civil Engineer Maint Shop 223 May-09 Aug-09 Nov-09<br />

XUMU061136<br />

B<br />

Renovate Training Facility at Civil Engineer Horizontal Shop,<br />

Bldg 10719<br />

241 Jun-09 Jul-09 Dec-09<br />

XUMU091138<br />

B<br />

Repair Chillers for Electronics Lab at Missile Maint Fac 262 Jun-09 Aug-09 Nov-09<br />

XUMU101065<br />

B<br />

Maintain Backflow Prevention Devices Basewide, Fy09 269 Sep-09 Sep-09 Sep-10<br />

XUMU111004<br />

A<br />

Repair North Edge of Road West of Bldg 441 281 Apr-09 May-09 Jun-09<br />

XUMU991022<br />

B9<br />

Repair 8th Street 348 May-09 Jun-09 Oct-09<br />

XUMU061191<br />

E<br />

Energy Audit, Validate Short Circuit Analysis 377 Jul-09 Aug-09 Aug-10<br />

XUMU101090<br />

A<br />

Replace Electrical Switchgear at Ct-3 377 Jul-09 Oct-09 Dec-10<br />

XUMU101070<br />

C<br />

Construct Parking Lot Extension for Bldg 8314 444 Apr-09 May-09 Aug-09<br />

XUMU021010<br />

A<br />

Repair 35th Street 445 Apr-09 Jun-09 Jun-09<br />

XUMU071067<br />

B<br />

Repair Roof at Delta IV Solid Rocket Motor Facility 509 Apr-09 May-09 Mar-10<br />

XUMU091375<br />

A<br />

Base-Wide Facility Painting Contract 538 Apr-09 Apr-09 Oct-09<br />

XUMU081025<br />

B<br />

Repair Roof at Launch Vehicle Fab Shop, Bldg 8305 552 Apr-09 Jun-09 Dec-09<br />

XUMU081459<br />

B<br />

Repair CRAC Units In Admin Bldg 7025 597 May-09 Oct-09 Oct-10<br />

XUMU061155<br />

B1<br />

Repair 30 Mission Support Group HQ Overflow Parking Lot 614 Apr-09 May-09 Jul-09<br />

XUMU061075<br />

B5<br />

Replace HVAC, Phase 3, Launch Control Center 738 Jul-09 Oct-09 Apr-10<br />

XUMU051091<br />

B<br />

Repair 13th Street From Iceland Ave to California Blvd 856 Jun-09 Jul-09 Nov-09<br />

(1) Gap in project numbers results from project cancellations<br />

(2) Estimated construction dates are in plain text, actual construction dates are in italics<br />

(3) The projects listed represent those in the program as of 31 March 2010<br />

(4) As this annual update was done in May, any actual dates between 01 April 2010 and May 2010 are identified as actual dates<br />

Construction<br />

Attachment A – Page 140 of 225