DEPARTMENT OF DEFENSE / RECOVERY ACT<br />

FACILITIES SUSTAINMENT, RESTORATION, & MODERNIZATION PLAN – ATTACHMENT A<br />

(1) Gap in project numbers results from project cancellations<br />

(2) Estimated construction dates are in plain text, actual construction dates are in italics<br />

(3) The projects listed represent those in the program as of 31 March 2010<br />

(4) As this annual update was done in May, any actual dates between 01 April 2010 and May 2010 are identified as actual dates<br />

Construction<br />

Cost Contract Construction<br />

Project<br />

Estimate Award Construction Completion<br />

Installation/Location State Cat. Number Project Title<br />

($000) Date Start Date Date<br />

74 Anniston Army Depot AL E 38872 Industrial Area Electrical Repairs 1,196 Jun-09 Jul-09 Feb-11<br />

75 Anniston Army Depot AL O 38877 Building 143 Renovations for Stryker Reset Mission 460 Jun-09 Jul-09 Nov-09<br />

76 Fort Rucker AL Q 27403 Renovate B4605 4,700 Aug-09 Jan-10 Mar-11<br />

77 Fort Rucker AL P 30403 Resurface Farrel Road 450 Jul-09 Aug-09 Nov-09<br />

78 Fort Rucker AL P 34742 Bridge Repair - 09813 - Andrews Ave 300 Sep-09 Jan-10 May-11<br />

79 Fort Rucker AL P 29170 Bridge Repairs - B25459 250 Sep-09 Jan-10 May-11<br />

80 Fort Rucker AL P 29184 Bridge Repairs - B40161 250 Sep-09 Jan-10 May-11<br />

81 Fort Rucker AL E 34844 Repair Boiler - B4605 110 Aug-09 Feb-10 Mar-11<br />

82 Fort Rucker AL O 34603 Construct Pavilion 75 May-10 Jun-10 Aug-11<br />

83 Redstone Arsenal AL E 22845 Replace Natural Gas Dist Sys, Phase 4 4,290 Aug-09 Jan-10 Apr-11<br />

84 Redstone Arsenal AL E 35204 Replace Water Main Along Martin Rd from Zerdt to Patton 2,900 Sep-09 Sep-09 May-11<br />

85 Redstone Arsenal AL E 27627<br />

Replace Water Main Along Martin Road, from H.U. Tap to<br />

Patton Road With New 16" D.I. Main<br />

2,116 Sep-09 Jan-10 May-11<br />

86 Redstone Arsenal AL P 30289 Repair Concrete Turnarounds at Redstone Army Airfield 1,900 Jul-09 Jul-09 Nov-09<br />

87 Redstone Arsenal AL E 27678<br />

Replace Water Main Along Patton Rd. from Martin Rd. to<br />

Buxton Rd.<br />

1,879 Sep-09 Jan-10 Apr-11<br />

88 Redstone Arsenal AL E 27632<br />

Replace Water Main Along Paton Rd. from H.U. to Martin<br />

Rd.<br />

1,857 Sep-09 Jan-10 May-11<br />

89 Redstone Arsenal AL P 35008 Fy 2009 Annual Road Paving Plan 1,800 Jul-09 Jul-09 Nov-09<br />

90 Redstone Arsenal AL E 27681<br />

Replace Water Main Along Redstone Rd. from Patton to Line<br />

Rd. and Back to Patton<br />

1,755 Sep-09 Jan-10 May-11<br />

91 Redstone Arsenal AL E 27680<br />

Replace Water Main from Martin Rd. West of Patton to<br />

Vincent Looping Back to Patton<br />

1,618 Sep-09 Jan-10 May-11<br />

92 Redstone Arsenal AL E 27679<br />

Replace Water Main Along Buxton Road E. from Patton to<br />

H.U.<br />

1,312 Sep-09 Jan-10 May-11<br />

93 Redstone Arsenal AL E 32597 Replace Condensate Piping for 11 Buildings 1,200 Aug-09 Jan-10 Apr-11<br />

Attachment A – Page 5 of 225