28.09.2015 Views

3000 / 4000 / 5000

TotalArc² 3000/4000/5000 - Eutectic

TotalArc² 3000/4000/5000 - Eutectic

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MIG/MAG welding<br />

- Push axles - back in again - the anti-twist lock of each<br />

axle must latch into place<br />

- Push the pressure levers and downwards<br />

- Pivot the clamping devices and into the vertical position<br />

- Set the contact pressure by means of the clamping nuts<br />

and<br />

- Close the wire-spool cover or side panel<br />

Caution! Before starting up for the first time read the<br />

sections headed “Safety rules” and “Starting to use the<br />

power source”.<br />

- Plug the earth cable into the current socket and latch it in<br />

firmly.<br />

- Connect the other end of the earth cable to the workpiece<br />

- Plug the torch into the central torch connector<br />

- Attach the water hoses of the welding torch to the plug-type<br />

connections and<br />

- Plug the machine into the mains<br />

- Shift the mains switch into the "I" position (all the indicators<br />

on the control panel briefly light up)<br />

Caution! On water-cooled machines, the water-flow<br />

must be checked at regular intervals while the machine<br />

is in operation - you must be able to see that the coolant<br />

is flowing back properly.<br />

- Use the Process button to select the "MIG/MAG welding"<br />

process<br />

- Use the MIG/MAG mode button to select the desired<br />

operating mode<br />

- Use the torch mode button to select the desired operating<br />

mode<br />

N.B.! For details of how to set the parameters for the "Aluminium<br />

welding start-up" and "Spot welding" torch operating modes,<br />

please see the section headed "The set-up menu".<br />

- Use the Program button to select the desired welding<br />

program ("characteristic") according to the table of the programs<br />

- Specify the required welding power, via either the sheet<br />

thickness , welding current or wirefeed speed<br />

parameter<br />

N.B.! The parameters sheet thickness , welding current or<br />

wirefeed speed are directly interlinked. It is sufficient to<br />

change just one of the four parameters, as the other three<br />

parameters are always automatically adjusted to match.<br />

N.B.! (Applies to the "Spot welding" torch operating mode: If no<br />

current-flow starts up within 2 seconds, the machine switches<br />

itself off. This means that when you try again, you must press<br />

the torch trigger again.<br />

- Open the gas-cylinder valve<br />

- Set the gas-flow rate<br />

- Press the torch trigger and start welding<br />

In order to achieve an optimum welding result, it is necessary<br />

in some cases to make corrections to the arc-length correction<br />

and droplet-detachment / arc-force correction parameters as<br />

well as to the background parameters gas pre and post-flow and<br />

/ or soft-start.<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!