SMALL DAMS
SMALL DAMS - Comité Français des Barrages et Réservoirs
SMALL DAMS - Comité Français des Barrages et Réservoirs
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter IV<br />
It can only be completely eliminated for very small dams where H 2 V < 100, provided<br />
that the foundation is sufficiently watertight. The thickness of the layers must be<br />
sufficient to discharge the foreseen flow with a minimum thickness for each horizontal<br />
granular layer of 0.20 metre (drain and filter).<br />
If there is a relatively impermeable surface layer in the foundation, covering a much<br />
more permeable layer with its upper surface at a depth of less than H/3, it is<br />
recommended that decompression 1 wells (in general with piezometers) be drilled at<br />
the downstream base of the dam, spaced 10 to 25 metres apart. The decompression<br />
wells must be protected with a filtering material from the surrounding relatively<br />
impermeable material.<br />
FILL DAM DESIGN<br />
Depending on what usable materials are available, the fill dam will be one of the<br />
three types specified above, (pp. 67 and 70) homogeneous, zoned, or with manmade<br />
watertightening.<br />
CROOS-SECTION, CREST WIDTH, FREEBOARD<br />
73<br />
Maximum recommended slopes are 1/2. However, steeper slopes may be designed<br />
when coarse materials without fines are used (gravel, pebbles, boulders).<br />
The crest width L is generally determined by one of the following formulas where H is<br />
the height in metres:<br />
L = 1/3 H<br />
L = 1,65 H 1/2<br />
L = 3,6 H 1/3 - 3<br />
where L = 3 m minimum, in order to permit movement of machinery.<br />
Compacting the last layers may require a larger width.<br />
Crest width also depends on how that crest is to be used, e.g. for a road. For zoned<br />
dams, it may also depend on the number of zones at the crest.<br />
The following minimum widths are proposed:<br />
H 2 V < 100 100 to 300 > 300<br />
L minimum 3 m 4 m 5 m<br />
Table 2 - Minimum crest width<br />
1. Decompression wells must be accessible for cleaning.