<strong>Wimbledon</strong> – Construction phasing option<br />
year<br />
PHASE 4-6 – <strong>station</strong> fit out and OSD construction<br />
1<br />
2<br />
3<br />
Site 4 OSD opens<br />
4<br />
5<br />
4<br />
5<br />
Part of Centre Court demolished<br />
once new OSD opens in Site 4<br />
6<br />
7<br />
8<br />
9<br />
10<br />
• Construct new shopping centre<br />
• Station fit out and track<br />
installation 4 5<br />
25<br />
2.5 years