Connecting Europe Facility<br />

ENERGY<br />

Member States involved:<br />

United Kingdom<br />

CAES Larne EIA&FEED<br />

1.12-0020-UK-S-M-15<br />

Part of Project of Common Interest 1.12<br />

Implementation schedule<br />

Start date: May 2015<br />

End date: October 2016<br />

Budget:<br />

Estimated total cost of the action:<br />

€12,930,000<br />

Maximum EU contribution:<br />

€6,465,000<br />

Percentage of EU support: 50%<br />

Beneficiary:<br />

Gaelectric <strong>Energy</strong> Storage Ltd,<br />

www.gaelectric.ie<br />

Affiliated entity(ies):<br />

Gaelectric CAES NI Limited<br />

Additional information:<br />

European Commission<br />

http://ec.europa.eu/energy/infrastructu<br />

re/index_en.htm<br />

Innovation and Networks Executive<br />

Agency (INEA)<br />

http://inea.ec.europa.eu<br />

Agency for the Cooperation of <strong>Energy</strong><br />

Regulators (ACER)<br />

www.acer.europa.eu<br />

European Network of Transmission<br />

System Operators for Electricity<br />

(ENTSO-E)<br />

www.entsoe.eu<br />

The Action is a part of the PCI 1.12 Compressed air energy storage (CAES)<br />

in Larne (UK), which aims to build a compressed air energy storage facility<br />

using air storage caverns to be created in bedded salt deposits, the<br />

facility having an installed generation capacity of approximately 330<br />

MW and an annual storage capacity of approximately 1,426 GWh.<br />

The objective of this Action is to conduct the necessary studies that<br />

would prepare the PCI for the application of licences and to provide<br />

system services to the all-island Single Electricity Market in Northern<br />

Ireland. System Services is a key work stream within the Delivering a<br />

Secure, Sustainable, Electricity System Programme (DS3). The overall<br />

aim of the DS3 Programme is to put in place the required changes to<br />

system policies, tools and performance to allow the electricity system<br />

operate safely with a high penetration of wind.<br />

The scope of the Action involves submission of a planning application to the<br />

Planning Service in Northern Ireland. As part of the planning application an<br />

Environment Impact Analysis (EIA) is required to be submitted and<br />

its completion is part of this Action. It also involves the design<br />

development and completion of the Front-End Engineering Design (FEED)<br />

with detailed cost estimate and detailed schedule construction for the entire<br />

CAES facility.<br />

The Action is ongoing.<br />