Connecting Europe Facility<br />
ENERGY<br />
Member States involved:<br />
United Kingdom<br />
CAES Larne EIA&FEED<br />
1.12-0020-UK-S-M-15<br />
Part of Project of Common Interest 1.12<br />
Implementation schedule<br />
Start date: May 2015<br />
End date: October 2016<br />
Budget:<br />
Estimated total cost of the action:<br />
€12,930,000<br />
Maximum EU contribution:<br />
€6,465,000<br />
Percentage of EU support: 50%<br />
Beneficiary:<br />
Gaelectric <strong>Energy</strong> Storage Ltd,<br />
www.gaelectric.ie<br />
Affiliated entity(ies):<br />
Gaelectric CAES NI Limited<br />
Additional information:<br />
European Commission<br />
http://ec.europa.eu/energy/infrastructu<br />
re/index_en.htm<br />
Innovation and Networks Executive<br />
Agency (INEA)<br />
http://inea.ec.europa.eu<br />
Agency for the Cooperation of <strong>Energy</strong><br />
Regulators (ACER)<br />
www.acer.europa.eu<br />
European Network of Transmission<br />
System Operators for Electricity<br />
(ENTSO-E)<br />
www.entsoe.eu<br />
The Action is a part of the PCI 1.12 Compressed air energy storage (CAES)<br />
in Larne (UK), which aims to build a compressed air energy storage facility<br />
using air storage caverns to be created in bedded salt deposits, the<br />
facility having an installed generation capacity of approximately 330<br />
MW and an annual storage capacity of approximately 1,426 GWh.<br />
The objective of this Action is to conduct the necessary studies that<br />
would prepare the PCI for the application of licences and to provide<br />
system services to the all-island Single Electricity Market in Northern<br />
Ireland. System Services is a key work stream within the Delivering a<br />
Secure, Sustainable, Electricity System Programme (DS3). The overall<br />
aim of the DS3 Programme is to put in place the required changes to<br />
system policies, tools and performance to allow the electricity system<br />
operate safely with a high penetration of wind.<br />
The scope of the Action involves submission of a planning application to the<br />
Planning Service in Northern Ireland. As part of the planning application an<br />
Environment Impact Analysis (EIA) is required to be submitted and<br />
its completion is part of this Action. It also involves the design<br />
development and completion of the Front-End Engineering Design (FEED)<br />
with detailed cost estimate and detailed schedule construction for the entire<br />
CAES facility.<br />
The Action is ongoing.<br />