Connecting Europe Facility<br />
ENERGY<br />
Member States involved:<br />
Slovenia<br />
Implementation schedule<br />
Start date: November 2014<br />
End date: June 2016<br />
Study and validation of the optimal<br />
technologies for submarine/terrestrial line<br />
HVDC Slovenia-Italy<br />
3.21-0024-SI-S-M-14<br />
Part of Project of Common Interest 3.21<br />
Budget:<br />
Estimated total cost of the action:<br />
€400,000<br />
Maximum EU contribution:<br />
€200,000<br />
Percentage of EU support: 50%<br />
Beneficiary:<br />
ELES, Ltd., Electricity Transmission<br />
system operator<br />
www.eles.si<br />
Additional information:<br />
European Commission<br />
http://ec.europa.eu/energy/infrastructu<br />
re/index_en.htm<br />
Innovation and Networks Executive<br />
Agency (INEA)<br />
http://inea.ec.europa.eu<br />
Agency for the Cooperation of <strong>Energy</strong><br />
Regulators (ACER)<br />
www.acer.europa.eu<br />
European netwrok of Transmission<br />
System Operators for Electricity<br />
(ENTSO-E)<br />
https://www.entsoe.eu<br />
The Action is a study for the implementation of a part of the PCI 3.21 PCI<br />
Italy-Slovenia interconnection up to 1000 MW between Salgareda (IT) and<br />
Divača - Beričevo region (SI). The Action covers only Slovenian territory,<br />
from Divača or Beričevo to the Italo-Slovenian sea-border in the Gulf of<br />
Trieste, covering a distance between 48 km and 128 km, depending on the<br />
connection point – Divača or Beričevo – which is yet to be determined.<br />
The main objectives of the Action are to establish the optimum technology<br />
solution of the planned High Voltage Direct Current (HVDC) connection<br />
between the two countries and to prepare the Strategic Environmental<br />
Assessment (SEA) which are both necessary for the implementation of the<br />
project of common interest.<br />
For this purpose, firstly an analysis of the suitability of different HVDC<br />
technologies will be performed and, based on technical considerations the<br />
most suitable technological solution will be identified.<br />
Secondly, the Action will focus on the preparation of the Strategic<br />
Environmental Assessment (SEA), analysing and identifying the<br />
environmental risks, screening potential environmental impacts and<br />
studying the sensitivity of the environment.<br />