Connecting Europe Facility<br />

ENERGY<br />

Member States involved:<br />

Slovenia<br />

Implementation schedule<br />

Start date: November 2014<br />

End date: June 2016<br />

Study and validation of the optimal<br />

technologies for submarine/terrestrial line<br />

HVDC Slovenia-Italy<br />

3.21-0024-SI-S-M-14<br />

Part of Project of Common Interest 3.21<br />

Budget:<br />

Estimated total cost of the action:<br />

€400,000<br />

Maximum EU contribution:<br />

€200,000<br />

Percentage of EU support: 50%<br />

Beneficiary:<br />

ELES, Ltd., Electricity Transmission<br />

system operator<br />

www.eles.si<br />

Additional information:<br />

European Commission<br />

http://ec.europa.eu/energy/infrastructu<br />

re/index_en.htm<br />

Innovation and Networks Executive<br />

Agency (INEA)<br />

http://inea.ec.europa.eu<br />

Agency for the Cooperation of <strong>Energy</strong><br />

Regulators (ACER)<br />

www.acer.europa.eu<br />

European netwrok of Transmission<br />

System Operators for Electricity<br />

(ENTSO-E)<br />

https://www.entsoe.eu<br />

The Action is a study for the implementation of a part of the PCI 3.21 PCI<br />

Italy-Slovenia interconnection up to 1000 MW between Salgareda (IT) and<br />

Divača - Beričevo region (SI). The Action covers only Slovenian territory,<br />

from Divača or Beričevo to the Italo-Slovenian sea-border in the Gulf of<br />

Trieste, covering a distance between 48 km and 128 km, depending on the<br />

connection point – Divača or Beričevo – which is yet to be determined.<br />

The main objectives of the Action are to establish the optimum technology<br />

solution of the planned High Voltage Direct Current (HVDC) connection<br />

between the two countries and to prepare the Strategic Environmental<br />

Assessment (SEA) which are both necessary for the implementation of the<br />

project of common interest.<br />

For this purpose, firstly an analysis of the suitability of different HVDC<br />

technologies will be performed and, based on technical considerations the<br />

most suitable technological solution will be identified.<br />

Secondly, the Action will focus on the preparation of the Strategic<br />

Environmental Assessment (SEA), analysing and identifying the<br />

environmental risks, screening potential environmental impacts and<br />

studying the sensitivity of the environment.<br />

The Action is ongoing.<br />