Connecting Europe Facility<br />
ENERGY<br />
Member States involved:<br />
Lithuania<br />
LitPol Link construction<br />
4.5.1-0005-LT-W-M-15<br />
Part of Project of Common Interest 4.5.1<br />
Implementation schedule<br />
Start date: April 2015<br />
End date: February 2016<br />
Budget:<br />
Estimated total cost of the action:<br />
€54,753,000<br />
Maximum EU contribution:<br />
€27,376,500<br />
Percentage of EU support: 50%<br />
Beneficiary:<br />
Litgrid AB<br />
www.litgrid.eu<br />
Additional information:<br />
European Commission<br />
http://ec.europa.eu/energy/infrastructu<br />
re/index_en.htm<br />
Innovation and Networks Executive<br />
Agency (INEA)<br />
http://inea.ec.europa.eu<br />
Agency for the Cooperation of <strong>Energy</strong><br />
Regulators (ACER)<br />
www.acer.europa.eu<br />
European Network of Transmission<br />
System Operators for Electricity<br />
(ENTSO-E)<br />
www.entsoe.eu<br />
The current Action implements the first part of Project of Common Interest<br />
(PCI) 4.5.1 which is the interconnection between the Lithuanian and<br />
the Polish electricity system at the Lithuanian/Polish border called “LitPol<br />
Link”.<br />
The Action's goal is the construction and commissioning of approximately<br />
51 km double circuit 400 kV AC overhead line between Alytus (Lithuania) to<br />
the Polish border. This consists of the construction of OHL foundations,<br />
in the Lithuanian territory and the construction and co mmissioning of a<br />
500 MW High Voltage Direct Current (HVDC) back-to-back converter<br />
station with a 400 kV switchyard in Alytus (Lithuania). There will be<br />
8 single-phase converter station transformers, of which 2 will be<br />
spare ones. Once completed, it will pave the way for the commencement<br />
of the second phase of the LitPol Link.<br />
The Action is ongoing.<br />