Connecting Europe Facility<br />

ENERGY<br />

Member States involved:<br />

Portugal<br />

Implementation schedule<br />

Start date: October 2015<br />

End date: March 2019<br />

Environmental and engineering studies for the<br />

development of the internal Ribeira de Pena –<br />

Vieira do Minho 1/2, 400 kV double circuit<br />

overhead line (PT)<br />

2.16.3-0003-PT-S-M-15<br />

Part of Project of Common Interest 2.16<br />

Budget:<br />

Estimated total cost of the action:<br />

€500,000<br />

Maximum EU contribution:<br />

€250,000<br />

Percentage of EU support: 50%<br />

Beneficiary:<br />

Rede Eléctrica Nacional, S.A<br />

www.ren.pt<br />

Additional information:<br />

European Commission<br />

http://ec.europa.eu/energy/infrastructu<br />

re/index_en.htm<br />

Innovation and Networks Executive<br />

Agency (INEA)<br />

http://inea.ec.europa.eu<br />

Agency for the Cooperation of <strong>Energy</strong><br />

Regulators (ACER)<br />

www.acer.europa.eu<br />

European Network of Transmission<br />

System Operators for Electricity<br />

(ENTSO-E)<br />

www.entsoe.eu<br />

The current Action is part of the Project of Common Interest 2.16.1 internal<br />

line between Frades B, Ribeira de Pena and Feira which aims to connect the<br />

future Ribeira da Pena substation (400/60kV) to the existing Vieira do Minho<br />

switch station (400kV).<br />

The Action's aim is to prepare the necessary studies required for the<br />

construction of the PCI. The Action consists of two studies:<br />

a) Basic Study which will provide the large scale condition factors and<br />

determine the alternative line routes. It also includes a stakeholder<br />

consultation; and<br />

b) Design studies which will include studies covering materials and types of<br />

equipment, topographical and preliminary draft studies for the optimal line<br />

tracing and the position of the towers. It also includes an Environmental<br />

Impact Study (EIS) of the overhead line (OHL) which will be used for the<br />

Environmental Impact Assessment (EIA). The Action will end with the<br />

issuance of an Environmental Impact Declaration (EID).<br />

The Action is ongoing.<br />