Connecting Europe Facility<br />
ENERGY<br />
Member States involved:<br />
Czech Republic<br />
Implementation schedule<br />
Start date: August 2014<br />
End date: May 2016<br />
ay<br />
Budget:<br />
Estimated total cost of the action:<br />
€2,026,048<br />
Documentation for zoning permit of the line<br />
400 kV Vernerov-Vitkov, substation 400 kV<br />
Vitkov and Project study for substation 400<br />
kV Vernerov<br />
3.11.1-0036-CZ-S-M-14<br />
Part of Project of Common Interest 3.11.1<br />
Maximum EU contribution:<br />
€1,013,024<br />
Percentage of EU support: 50%<br />
Beneficiary:<br />
ČEPS, a.s.<br />
www.ceps.cz<br />
Affiliated entity(ies):<br />
ČEPS Invest, a.s.<br />
Additional information:<br />
European Commission<br />
http://ec.europa.eu/energy/infrastructu<br />
re/index_en.htm<br />
Innovation and Networks Executive<br />
Agency (INEA)<br />
http://inea.ec.europa.eu<br />
Agency for the Cooperation of <strong>Energy</strong><br />
Regulators (ACER)<br />
www.acer.europa.eu<br />
European Network of Transmission<br />
System Operators for Electricity<br />
(ENTSO-E)<br />
https://www.entsoe.eu<br />
The Action is a part of the 3.11.1 PCI Internal line between Vernerov<br />
and Vitkov (CZ), which is a 400 kV AC double circuit overhead<br />
line of approximately 75 km and with a capacity of 2x1730 MVA.<br />
The Action consists of the preparation and approval of the<br />
documentation for the zoning permit for the construction of the 400 kV<br />
AC double circuit overhead transmission line between Vernerov and Vítkov<br />
(onshore) and the documentation for the zoning and building permi ts for<br />
the construction of the 400 kV substation Vitkov. The documents to be<br />
prepared are obligatory under the Building Act of the Czech Republic<br />
(No. 183/2006 Coll.). The zoning and building permit is among the<br />
grant permits which need to be ensured and obtained before the<br />
construction of the PCI starts.<br />
The Action will be completed with the submission of the application for<br />
the zoning and building permit to the competent authorities.<br />
The Action is ongoing.<br />