SBIR-STTR_2016_Year_in_ReviewV6-WEB
SBIR-STTR_2016_Year_in_ReviewV6-WEB
SBIR-STTR_2016_Year_in_ReviewV6-WEB
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TOPIC NUMBER<br />
AF15-AT31<br />
AF15-AT33<br />
AF15-AT34<br />
AF15-AT35<br />
AF15-AT38<br />
AF15-AT39<br />
AF15-AT40<br />
TOPIC TITLE<br />
Environmentally-Compliant Inorganic Material(s) for Corrosion and/or Wear Protection of Structural<br />
Metals on Military Aircraft and Weapon Systems<br />
High Speed Electronic Device Simulator<br />
Enabl<strong>in</strong>g Mov<strong>in</strong>g Target Hand-off <strong>in</strong> GPS-Denied Environments<br />
Small Sample Size Semi-Supervised Feature Cluster<strong>in</strong>g for Detection and Classification of Objects and<br />
Activities <strong>in</strong> Still and Motion Multi-spectral Imagery<br />
Diagnostics and Test Techniques for Complex Multiphysics Phenomena <strong>in</strong> Hypersonic Environments<br />
Power Generation for Long Duration Hypersonic Platforms<br />
Impact of Hypersonic Flight Environment on Electro-Optic/Infrared (EO/IR) Sensors<br />
<strong>STTR</strong><br />
2015.3 TOPICS<br />
15 U.S.C. §638 (cc), as amended by NDAA (National<br />
Defense Authorization Act) FY 2012, Sec. 5106, PILOT TO<br />
ALLOW PHASE FLEXIBILITY, allows the Department of<br />
Defense to make an award to a small bus<strong>in</strong>ess concern<br />
under Phase II of the <strong>SBIR</strong> program with respect to a<br />
project, without regard to whether the small bus<strong>in</strong>ess<br />
concern was provided an award under Phase I of an <strong>SBIR</strong><br />
program with respect to such project. The Air Force<br />
conducted a “Direct to Phase II” pilot implementation<br />
of this authority for this 15.3 <strong>SBIR</strong> solicitation (although<br />
it does not guarantee the pilot will be offered <strong>in</strong> future<br />
solicitations). Each eligible topic requires documentation<br />
to determ<strong>in</strong>e that Phase I feasibility and the technical<br />
requirements for a Direct to Phase II proposal have been<br />
met.<br />
The follow<strong>in</strong>g Air Force topics were released for the <strong>SBIR</strong> 2015.3 solicitation.<br />
TOPIC NUMBER<br />
AF153-001<br />
AF153-002<br />
AF153-003<br />
AF153-004<br />
TOPIC TITLE<br />
Global Surveillance Augmentation Us<strong>in</strong>g Commercial Satellite Imag<strong>in</strong>g Systems<br />
Handheld Dismount Kit for Persistent, Precision Navigation <strong>in</strong> GPS-challenged Environments for Military<br />
Operations<br />
Additive Manufactur<strong>in</strong>g to Support 100% Parts Availability<br />
Additive Manufactur<strong>in</strong>g of Mask<strong>in</strong>g to Support Turb<strong>in</strong>e Eng<strong>in</strong>e Susta<strong>in</strong>ment<br />
38