Failures of main gas pipelines PJSC “UKRTRANSGAZ” during 2015-2016
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Failures</strong><br />
<strong>of</strong> <strong>main</strong> <strong>gas</strong> <strong>pipelines</strong><br />
<strong>PJSC</strong> <strong>“UKRTRANSGAZ”</strong> <strong>during</strong> <strong>2015</strong>-<strong>2016</strong>
Failure <strong>of</strong> <strong>main</strong> pipeline «Kramatorsk-Donetsk-Mariupol» DN<br />
1000 and <strong>gas</strong> pipeline branch to GMS «Donetsk-2» DN 500<br />
1. Failure caused by fighting<br />
2. The failure was eliminated in cooperation with military<br />
force <strong>of</strong> Ukraine including 49 workers and 21 special<br />
purpose vehicles:<br />
• 48 workers <strong>of</strong> Main Pipeline Division KHARKIVTRANSGAZ;<br />
• 1 worker <strong>of</strong> Centre for Technical Inspection<br />
TECHDIAGAS.<br />
3. Emergency recovery works:<br />
• start: 7 10 a.m 12.06.15<br />
• finish: 4 00 p.m 16.09.15<br />
• duration: 105 hours<br />
4. Gas leakage - 5,1 Mcm , <strong>gas</strong> cost UAH 29, 5 mln.
Failure <strong>of</strong> <strong>main</strong> pipeline «Soiuz» DN 1400 on the 2577 th кm<br />
1. Failure caused by depressurization <strong>of</strong> a ring weld in<br />
mountainous area<br />
2. The depressurization <strong>of</strong> the ring weld was caused by<br />
assembly defects and by the ring weld at the stage <strong>of</strong><br />
pipeline construction.<br />
3. The failure was eliminated by 62 workers and 24 special<br />
purpose vehicles :<br />
• 54 workers <strong>of</strong> Main Pipeline Division<br />
PRYKARPATTRANSGAZ<br />
• 5 workers <strong>of</strong> Construction Division UKRGASPROMBUD<br />
• 3 workers <strong>of</strong> Centre for Technical Inspection TECHDIAGAS<br />
4. Emergency recovery works :<br />
• start: 8 00 a.m 02.01.16 ;<br />
• finish: 3 00 a.m 05.01.16;<br />
• duration: 63 hours<br />
5. Gas leakage 809 thous. cub.m , <strong>gas</strong> cost UAH 6 mln.
Failure <strong>of</strong> <strong>main</strong> pipeline «Komarno-Drozdovychi» DN 500 on the 6 th кm<br />
1. Failure was caused by depressurization <strong>of</strong> heat-affected<br />
zone <strong>of</strong> manufacture longitudinal joint for pipe spool with<br />
length <strong>of</strong> 6 m and consequential breakage <strong>of</strong> this section with<br />
length <strong>of</strong> 4,5 m and fragment ejections on the ground.<br />
2. The depressurization was caused by a stress corrosion<br />
crack.<br />
3. The failure was eliminated by 69 workers and 22 special<br />
purpose vehicles :<br />
• 60 workers <strong>of</strong> Main Pipeline Division LVIVTRANSGAZ<br />
• 6 workers <strong>of</strong> Construction Division UKRGASPROMBUD<br />
• 3 workers <strong>of</strong> Centre for Technical Inspection TECHDIAGAS<br />
4. Emergency recovery works:<br />
• start: 9 10 p.m 10.01.16<br />
• finish: 10 55 a.m 12 .01. <strong>2016</strong>;<br />
• duration: 38 hours<br />
5. Gas leakage 859 thous. mcm, cost UAH 5,5 mln
Failure <strong>of</strong> <strong>main</strong> pipeline «АTI» on the 178 th кm<br />
1. Failure caused by through fault <strong>of</strong> pipe (crack) on the pipe<br />
<strong>of</strong> cold rolling.<br />
2. The failure was caused likely by cycle load for this pipe<br />
section which seemed to be appeared <strong>during</strong> construction<br />
when cold rolling had been performed with technological<br />
process disruption .<br />
3. The failure was eliminated by 88 workers and 30 special<br />
purpose vehicles :<br />
• 49 workers <strong>of</strong> Main Pipeline Division PRYKARPATTRANSGAZ<br />
• 37 workers <strong>of</strong> Construction Division UKRGASPROMBUD<br />
• 2 workers <strong>of</strong> Centre for Technical Inspection TECHDIAGAS<br />
4. Emergency recovery works:<br />
• start: 7 36 p.m 29.08.16<br />
• finish: 9 10 p.m 02.08.16<br />
• duration: 98 hours<br />
5. Gas leakage 445 thous. mcm, cost UAH 2,7mln.
Failure <strong>of</strong> <strong>main</strong> pipeline «Dashava - Minsk» DN 800 looping<br />
1. Failure caused by depressurization <strong>of</strong> pipe section<br />
2. The depressurization was caused by metal laminations <strong>of</strong><br />
pipe on the section with size 150х370 mm resulted in<br />
metal hardness deprivation on this section and pipe<br />
opening with length <strong>of</strong> 14 meters<br />
3. The failure was eliminated by 76 workers and 23 special<br />
purpose vehicles :<br />
• 67 workers <strong>of</strong> Main Pipeline Division LVIVTRANSGAZ<br />
• 6 workers <strong>of</strong> Construction Division UKRGASPROMBUD .<br />
• 3 workers <strong>of</strong> Centre for Technical Inspection TECHDIAGAS<br />
4. Emergency recovery works:<br />
• start: 07 00 a.m. 09.09.16<br />
• finish: 00 30 11.09.16<br />
• duration: 44 hours<br />
5. Gas leakage 802 thous. mcm, <strong>gas</strong> cost UAH 5,4 mln.