10.12.2012 Views

Imperial Tutorial - Autodesk

Imperial Tutorial - Autodesk

Imperial Tutorial - Autodesk

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

15 Right-click Hydronic Supply 1, and click Select.<br />

The hydronic supply system highlights in red indicating the logical connection.<br />

IMPORTANT Although you can draw pipe to create the physical pipe connections, you must create<br />

a system for Revit MEP to perform calculations such as flow and pressure. Remember that systems<br />

can be created before or after pipe, or even without pipe being drawn.<br />

16 Repeat this method to validate the Hydronic Return System logical connection.<br />

17 If you want to save your work, click File menu ➤ Save.<br />

18 In the Save As dialog, enter Creating Piping Systems Training for File name, navigate to the<br />

folder of your choice, and click Save.<br />

In this exercise, you created the supply and return piping systems to logically connect the radiators and<br />

boiler. You learned how the System Browser organizes system components and systems, and you used the<br />

System Browser to confirm and validate the newly created systems. Now that you logically connected the<br />

piping system components, in the next exercise, you create the level 2 pipe runs to physically connect the<br />

system components.<br />

Creating Pipe Runs<br />

In this exercise, you design 2 pipe layouts and then create the supply and return pipe runs based on these<br />

layouts. The pipe runs physically connect the level 2 radiators. In a later exercise, you connect the boiler to<br />

the pipe runs.<br />

Dataset<br />

■ Click File menu ➤ Open.<br />

■ In the left pane of the Open dialog, click the Training Files icon.<br />

■ Open the i Creating Pipe Runs.rvt file located in the <strong>Imperial</strong> ➤ Mechanical folder.<br />

1 In the Project Browser, expand Views (Discipline) ➤ Mechanical ➤ Piping ➤ Floor Plans, and<br />

double-click 2 - Piping to make it the active view.<br />

Create the level 2 supply pipe layout<br />

204 | Chapter 5 Mechanical Systems: Piping<br />

2 Place the cursor outside of the building at the upper left corner, drag the cursor to the lower<br />

right corner to draw a pick box around the entire floor plan.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!