10.12.2012 Views

Imperial Tutorial - Autodesk

Imperial Tutorial - Autodesk

Imperial Tutorial - Autodesk

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

45 Click Modify.<br />

394 | Chapter 7 Plumbing Systems<br />

46 In the Project Browser, expand Mechanical ➤ Plumbing ➤ 3D Views, double-click 3D- Plumbing,<br />

and click View menu ➤ Orient ➤ Northeast.<br />

47 Zoom in on the area behind the toilets, select the rightmost toilet.<br />

48 On the Options Bar click (Connect Into), and then click the vertical cold water pipe.<br />

Piping is automatically created between the vertical pipe and the toilet cold water connector.<br />

49 Select the elbow behind the toilet, and click the + control to change it to a tee.<br />

50 On the Plumbing tab, click Pipe.<br />

51 Select the tee, right-click the open connector, click Draw Pipe, and press the Space Bar so that<br />

the pipe assumes the size and elevation of the fixture.<br />

52 Drag the preview to the left while maintaining the same angle, and when the center line for<br />

the left toilet displays, click to specify the endpoint as shown.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!