Çimtaş Steel and Çimtaş Module<br />

and Shipyard successfully achieved<br />

on time completion of the<br />

Project where in total Çimtaş has<br />

performed:<br />

• Fabrication of 52,000 tons<br />

welded steel as panels.<br />

• Formation and trial assembly of<br />

108 tower and 113 girder blocks.<br />

• Combination of the girder<br />

blocks on the ground in pairs,<br />

to form so called “Mega Blocks”<br />

each with a size of 35 m x 50 m<br />

x 5 m.<br />

• Delivery of blocks to erection<br />

site by “GMK-1”, a 4,400 DWT<br />

dynamic positioning vessel<br />

built by Çimtaş Module and<br />

Shipyard.<br />

• Execution of girder block site<br />

welding works.<br />

Çimtaş Steel being the leading steel<br />

wind tower manufacturer in Turkey<br />

set a new record in 2016 with a<br />

fabrication of 22,000 tons of wind<br />

towers for Nordex (Germany) and<br />

Enercon (Germany).<br />

Other fabrication projects of<br />

Çimtaş Steel in year 2016:<br />

12,000 tons of structural steel for:<br />

• Besmaya CCPP Project / Iraq for<br />

ENKA<br />

• SCPX Project / Georgia for<br />

Bechtel – ENKA JV<br />

• Kashirskaya Multifunctional<br />

Shopping Centre Project /<br />

Russia for ENKA<br />

• New York Wheel Project / USA<br />

for Mammoet-Starneth LLC<br />

1,500 tons of pressure vessels for:<br />

• Saudi Aramco’s Jazan Refinery /<br />

K.S.A. for Saipem<br />

• Tengiz Oilfield / Kazakhstan for<br />

TCO LLP<br />

• West Nile Delta Project / Egypt<br />

for Bechtel<br />

Fabrication of the New York Wheel Project’s RIM Sections<br />

has been started by the 2nd quarter of 2016 and<br />

scheduled to be completed by the 3rd quarter of 2017.<br />

In addition to RIM Sections, Çimtaş Steel has also been<br />

awarded additional scopes of the project which are RIM<br />

Reinforcements (temporary supports for erection) and<br />

Transport Frames.<br />

Çimtaş Steel has included large scale machined fabrication<br />

into its business lines with the new milling and<br />

machining investments in 2016.<br />

As a result of these investments, Çimtaş Steel made an<br />

agreement with Enercon to manufacture the first 25<br />

sets of wind turbine rotor & stator rings which are large<br />

welded and machined units. Following the first order<br />

of 25 sets, the parties have been working on a plan for<br />

manufacturing 200 sets annually in the coming years.<br />

Çimtaş Steel has also reached an agreement with GE<br />

for supply of exhaust frames of their heavy duty gas<br />

turbine systems with an initial order of 5 sets including<br />

precision welded steel fabrications with oversize<br />

machining processes. In line with its aim to provide<br />

integrated solutions to the customers, Çimtaş Steel will<br />

also undertake the supply and installation of insulation<br />

and stainless steel casing works in 2017.<br />

Çimtaş Steel received two consecutive “Best Partner”<br />

awards by Nordex; “Special Recognition” Award from<br />

Tekla for the İzmit Bay Crossing Suspension Bridge and<br />

two “Export Championship” awards by İstanbul Mineral<br />

& Metals Exporters’ Association in 2016.<br />