ENKA TEKNİK<br />
Genel Müteahhitlik Bakım İşletme Sevk ve İdare A.Ş.<br />
assured by employee implementation of health and<br />
safety precautions.<br />
Established in 1981, ENKA Teknik has become a partner<br />
of preference for turnkey projects involving plant<br />
engineering, fabrication, procurement, construction<br />
and assembly works and the commissioning and<br />
operation of industrial projects. It regularly completes<br />
all tasks to the full satisfaction of its clients. Its project<br />
management system software, developed entirely<br />
in-house, ensures the security and traceability of<br />
documents, information and data, and is the main tool<br />
used for rapid and accurate decision-making in the<br />
projects which ENKA Teknik undertakes.<br />
ENKA Teknik serves clients in Turkey, North Africa, the<br />
Middle East and Central Asia, either as main contractor<br />
or as a consortium partner, in its main areas of business<br />
– namely: energy plants, oil and gas systems, water<br />
treatment plants and environmental systems, cement<br />
plants, materials handling, processing and storage<br />
systems, balance of plant (BoP), and electrical and<br />
control systems.<br />
The primary objective of ENKA Teknik is, and has always<br />
been, customer satisfaction. This is achieved through<br />
effective implementation of the ISO 9001 Quality<br />
Management System, and through the “Zero Accident”<br />
target which has been set by the management and is<br />
ENKA Teknik makes its services available through its<br />
head office in Istanbul, its offices in Libya (Tripoli) and<br />
Iraq (Basra), and its offices at project sites. The head<br />
office continued its business development activities<br />
in 2016 by tracking projects in the company’s areas of<br />
business and preparing various proposals, which are<br />
currently under evaluation by customers.<br />
The Awbari 4x160 MW Gas Turbine Power Plant Project<br />
has been carried out under a contract worth 378 million<br />
EUR which was signed prior to the Libyan uprising<br />
of 2011. The signatories were the General Electricity<br />
Company of Libya (GECOL) on the one hand and a<br />
consortium of GESCO (a GECOL subsidiary that provides<br />
GTG equipment) and ENKA Teknik on the other.<br />
ENKA Teknik’s share in the consortium was valued at 170<br />
million EUR. Work on the site had to be suspended in 2011<br />
and 2014, at the stages of start-up and commissioning<br />
respectively, due to political and civil unrest. Since the<br />
end of 2014, the remaining engineering works have<br />
been performed and the remaining supplies have been<br />
provided. ENKA Teknik has held a series of high-level<br />
meetings with GECOL and the Government of Libya<br />
in order to establish a road map for the resolution<br />
of outstanding issues. A protocol addressing ENKA<br />
Teknik’s concerns about the project was signed on 30<br />
October 2016.<br />
A STRONG PARTNER FOR ENGINEERED<br />
SOLUTIONS<br />
The primary objective of ENKA Teknik is, and has always been to meet customer satisfaction<br />
achieved by effective implementation of the ISO 9001 Quality Management System.<br />
70 | ENKA Annual Report 2016<br />
1981<br />
35 YEARS OF EXPERIENCE<br />
2016<br />
ENKA Annual Report 2016 | 71