Mauldin March Report
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sewer <strong>Report</strong>s<br />
Permit Drawing Review | 6 Manhole Inspections | 39<br />
Inspect Contstruction Sites | 4<br />
Inspect PW Crews | 12<br />
Manhole Repairs | 7<br />
Sewer Main Creek Crossings | 22<br />
Video Recording | 4490 LF<br />
Cleans Sewer Trunk Lines | 4400 LF<br />
ROW Easement Maintenance | 400 LF<br />
Sewer | Manhours Task Allocation<br />
Repair Water Service to Deer Field Lift Station | 30 MH<br />
Clean Storm Drains | 10 MH<br />
Traffic Control | 16 MH<br />
Equipment Maintenance | 13 MH<br />
Equipment Pre-trip | 25 MH<br />
Training | 18 MH<br />
Pump Station Inspection | 7 MH<br />
Sewer | Percentages of Labor Hours<br />
Admin/Plan Reviews | 14%<br />
Equipment Pre-Trip | 5%<br />
Weekly Equipment PMIs | 5%<br />
Assign. to Street Dept. | 5%<br />
Manhole Inspections | 6%<br />
Manhole Repairs | 3%<br />
Pump Station Inspections | 6%<br />
ROW - Easement Maint | 12%<br />
Sewer Trunk Line Cleaning | 21%<br />
Training | 4%<br />
Video Recording | 19%<br />
CHAMBER CORNER<br />
Looking for a job? Spruce up your resume and head to our<br />
job fair! Fifteen local businesses will be on-site at the Cultural<br />
Center (101 E. Butler) on <strong>March</strong> 29, 10 a.m. to 2 p.m. For<br />
details, contact the Greater <strong>Mauldin</strong> Chamber of Commerce<br />
at info@mauldinchamber.org or 864.297.1323.