19.01.2018 Views

Pegasus Post: November 07, 2017

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SOUTHERN VIEW Latest Christchurch news at www.star.kiwi<br />

9<br />

News<br />

Tuesday <strong>November</strong> 7 <strong>2017</strong><br />

Local<br />

News<br />

Now<br />

Developer to revisit complex plans<br />

Fire rages, homes at risk<br />

• By Sarla Donovan<br />

COMMUNITY concern over<br />

a shopping and entertainment<br />

complex in Church Bay has<br />

forced a rethink on how it will<br />

look.<br />

Spence Developments wants<br />

to build a supermarket and<br />

111-space car park, four shops, a<br />

cafe and a 30-seat cinema at 139-<br />

143 Marine Drive, behind the<br />

On the Spot store.<br />

The Church Bay<br />

Neighbourhood Association<br />

has expressed misgivings<br />

about whether the building<br />

would fit in to the semi-rural<br />

environment.<br />

Corrugated iron, timber<br />

or stone were suggested as<br />

alternatives to the proposed<br />

tilt-slab construction<br />

materials.<br />

Association secretary Pat<br />

Pritchett said they had been in<br />

touch with Spence Developments<br />

to give their feedback.<br />

She was pleased at the designs<br />

would now be revisited.<br />

“I hope they’re looking at not<br />

using tilt slab as part of that. It’s<br />

good to know they’ve listened to<br />

the community and I hope they<br />

continue to do so,” she said.<br />

Spence Developments was<br />

planning to lodge a resource<br />

consent application with the<br />

city council this month but<br />

community reaction to the look<br />

and size of the development<br />

along with concerns over access<br />

points have led to the project<br />

being pushed back by a month.<br />

Development spokesman,<br />

planning consultant James<br />

Hook, said a “revised site<br />

plan and elevations” would be<br />

released in two weeks.<br />

He was still optimistic<br />

resource consent would<br />

be lodged before Christmas.<br />

OPENING<br />

NIGHT<br />

PROPOSAL:<br />

An artist’s<br />

impression of<br />

the original<br />

development<br />

proposal on<br />

Marine Drive.<br />

James Hook<br />

www.ruapunaspeedway.co.nz<br />

WAR<br />

OF<br />

THE<br />

WINGS<br />

20+ SPRINTCARS FROM AROUND THE SOUTH ISLAND<br />

SATURDAY 11 NOVEMBER <strong>2017</strong><br />

GATES OPEN - 5.30pm • TImE TRIALS - 6pm • DIRT STARTS FLYING - 6.30pm<br />

ADULTS $20 • STUDENTS/SENIORS $15 • KIDS U/14 FREE (WITH AN ADULT)<br />

FAMILY: 2 ADULTS & UP TO 4 KIDS $40 • EFTPOS AVAILABLE<br />

If wet check the Speedway Infoline 03 349 7727<br />

or www.ruapunaspeedway.co.nz or FACEBOOK Ruapuna Speedway

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!