24.05.2018 Views

AKE Brochure EN

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BUSINESS DIVISION ASSEMBLY & TESTING TECHNOLOGY<br />

Assembly systems for door hinges and door catches<br />

compact system structure, with accessible system<br />

stage for control cabinets, promises space-saving<br />

integration into the existing hall layout.<br />

The <strong>AKE</strong> assembly systems for the manufacture of<br />

door catches also impress through very short cycle<br />

times. A component is assembled and tested in<br />

only 5 seconds. Various component variants can be<br />

assembled in the system. High-resolution camera<br />

systems measure and recognise the components<br />

fed to them. All assembly processes in the system are<br />

monitored automatically, and the process data is then<br />

saved.<br />

In addition to assembly systems for electric<br />

components, systems for the assembly of kinematic<br />

components are a further significant source of<br />

income.<br />

<strong>AKE</strong>’s assembly testing system makes manufacture<br />

and testing of door hinges possible with a cycle time<br />

of only 4 seconds. The assembly of different types<br />

can be performed using a single system. An operative<br />

performs the insertion of the hinge bodies. Here,<br />

the parts are inserted either directly into the rotary<br />

indexing table integrated into the system or into<br />

an upstream feeder station. Small parts are made<br />

available via conveyor systems, with a buffer time of<br />

2 hours.<br />

Our assembly concepts are highly flexible because<br />

of the use of operative/robotics combinations. The<br />

The testing of components is decisive in the<br />

manufacture of vehicle components. Below is an<br />

extract from testing processes already implemented:<br />

- 2D + 3D measurement<br />

- Acceleration/vibration<br />

- Image processing<br />

- Testing of torque and turning angle<br />

- Pressure testing<br />

- Flow testing<br />

- Electrical testing<br />

- Colour testing<br />

- Moisture measurement<br />

- Weight testing<br />

- Helium leak testing for leakproofness<br />

- Force/displacement evaluation<br />

- Temperature measurement<br />

Assembly system for<br />

door hinges<br />

Assembly system for<br />

door catches<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!