16.12.2012 Views

Read News Magazine (pdf) - Offshore Center Danmark

Read News Magazine (pdf) - Offshore Center Danmark

Read News Magazine (pdf) - Offshore Center Danmark

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

State-of-the-Art Design Standard<br />

specifically developed and applicable<br />

for <strong>Offshore</strong> Wind Turbine Structures<br />

The DNV services includes the Manufacturing,<br />

Installation and In-service Phase and<br />

the requirements are given with focus on the<br />

structural integrity of the installed structure<br />

Join our committees<br />

By Tove Feld, DNV Global Wind Energy<br />

The wind energy industry requires cost-effective<br />

design for offshore wind turbine<br />

structures in order to make the projects<br />

economically viable. A year ago none of the<br />

existing standards were truly applicable to<br />

offshore wind projects with a different loading<br />

scheme compared to the traditional oil<br />

and gas offshore structures, e.g. going from<br />

wave dominated to wind dominated.<br />

As a member of <strong>Offshore</strong> <strong>Center</strong> Denmark, you may also<br />

participate in the work of the four permanent working groups<br />

within the centre.<br />

The four committees each represent the interest of a number<br />

of members, who themselves have defined the groups<br />

The committees are:<br />

• Mobile & stationary offshore installations<br />

• <strong>Offshore</strong> Wind Turbines<br />

• HSEQ - Health, Safety, Environment & Quality<br />

• Decommissioning of offshore structures<br />

18 <strong>Offshore</strong> <strong>Center</strong> Denmark<br />

<strong>News</strong>letter ON/OFF 3 - August 2004<br />

This let to the development of a new<br />

state-of-the-art offshore standard ‘Design<br />

of <strong>Offshore</strong> Wind Turbines Structures’, I<br />

DNV-OS-J101. (First edition issued June 1st<br />

2004), specific developed and applicable for<br />

offshore wind turbine structures. The new II<br />

standard is based on DNV´s experience from<br />

participation in more than 24 offshore wind<br />

projects and general rule development from III<br />

maritime and offshore industries for decades,<br />

resulting in a rational set of state-of-the-art<br />

rules allowing fit-for-purpose design.<br />

IV<br />

DNV Project Certificate<br />

The challenge has been to establish a sound<br />

basis for development of projects both<br />

technically and economically that would be V<br />

recognized by all parties involved in offshore<br />

wind projects: owners, manufacturers,<br />

finance, insurance and authorities. Consequently<br />

the newly issued DNV-OS-J101 is VI<br />

a cost effective design standard, living up to<br />

safety levels required by authorities and other<br />

parties involved in offshore wind projects.<br />

In addition the standard account for the fact<br />

Certificate<br />

Maintenance<br />

that the structures are unmanned and the risk<br />

for pollution of the environment is limited,<br />

opposite the existing offshore standards.<br />

The new design standard has been chosen<br />

and is currently being used as Design<br />

standard on a number of <strong>Offshore</strong> Wind<br />

Projects around the world. The standard and<br />

the project certification serves the purpose<br />

of creating the trust and confidence between<br />

the parties that is needed for accelerating the<br />

development of offshore wind farms. ■<br />

Design Basis<br />

Design<br />

Manufacturing<br />

Installation<br />

Commissioning<br />

In-Service<br />

Statement of Compliance<br />

Statement of Compliance<br />

Statement of Compliance<br />

Statement of Compliance<br />

Statement of Compliance<br />

Schematics over the DNV Project Certification<br />

Scheme<br />

Each group has appointed a chairman.<br />

To apply for membership of a committee please forward<br />

your request to <strong>Offshore</strong> <strong>Center</strong> Denmark, who will relay<br />

the request to the chairman.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!