10.09.2018 Views

Portfolio de Myriam Rodrigue 2018

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

40<br />

In this proposition, we wanted to transform the shopping center,<br />

currently acting as a barrier, as an element articulating the<br />

different areas of use (industrial, resi<strong>de</strong>ntial, commercial and<br />

river (see diagram p.30)) found in the chosen sample.a<br />

The re-weaving the urban fabric was, among others, the result<br />

of the extension and the creation of some streets, but also, it<br />

was the result of the diversion of traffic <strong>de</strong>livery trucks from the<br />

Industrial Boulevard to the rue du Havre, which was exten<strong>de</strong>d<br />

to the port. These roads changes have ma<strong>de</strong> 2 things possible:<br />

First, the movement of the main industrial <strong>de</strong>livery road in the<br />

industrial zone, ma<strong>de</strong> it possible to implement new office buildings<br />

and services for industrial use of both si<strong>de</strong>s of Industrial<br />

Boulevard to create a better transition interface between commercial<br />

and industrial areas. This road has a new function and<br />

is now pe<strong>de</strong>strian friendly.<br />

Secondly, the diversion of the industrial traffic lanes reasulted in<br />

the reduction of the traffic in the lanes at the north of the mall.<br />

They are now disproportionately wi<strong>de</strong>. This allowed a reduction<br />

and a reorganization of the routes. This action resulted the<br />

creation of a public place facing the river and linked to the mall.<br />

The Mall:<br />

A consolidation taking into account the normal lifetime of a<br />

mall (50 years) was ma<strong>de</strong> at the north of it. In other words, if<br />

at the end of its life the mall is going to be <strong>de</strong>stroy, the consolidation<br />

has been done to transform the land where the mall<br />

is located in 3 new blocks. In case where it would be rebuilt or<br />

renovated, the new shopping center passages will ensure permeability<br />

between the areas of use of this long-term tissue. In<br />

the short term, this permeability is ensured by the introduction<br />

of a new main entrance on the front si<strong>de</strong> of Industrial Boulevard<br />

and with the implementation of a new tram station on this road.<br />

In the long term, it will be ensured by the new consolidation.<br />

In this new consolidation, the parking has been moved at the<br />

back of the shopping. A park and a newly built neighbourhood<br />

replaced the old parking. The roof of the new shopping center<br />

acts like a physical link between the industrial and the new<br />

neighbourhood.<br />

0 1 2,5<br />

5km<br />

3<br />

Adding and removing streets to redirect<br />

traffic onto alternative routes<br />

The <strong>de</strong>viated traffic flow results<br />

in giving a new public access<br />

point to the river

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!