Selwyn Times: March 06, 2019
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SELWYN TIMES Latest Christchurch news at www.star.kiwi<br />
Wednesday <strong>March</strong> 6 <strong>2019</strong> 7<br />
Playground repairs set to<br />
cost ratepayers $70,000<br />
• By Anan Zaki<br />
RATEPAYERS are footing<br />
a $70,000 bill to repair<br />
a playground built by a<br />
subdivision developer.<br />
Levi Park playground off<br />
Strauss Drive, Rolleston,<br />
was built by developers<br />
Gillman Wheelan in 2014,<br />
but it was constructed<br />
on poor soil, causing the<br />
playground to slump late<br />
last year.<br />
But, in spite of the<br />
playground not being built<br />
by the district council, it<br />
is paying to repair it. The<br />
district council did not<br />
respond to questions from<br />
<strong>Selwyn</strong> <strong>Times</strong> about why<br />
ratepayers had to foot the<br />
bill. Gillman Wheelan<br />
said it is working with the<br />
district council to resolve<br />
the issue.<br />
It was dubbed New<br />
Zealand’s first “smart<br />
playground” as it had<br />
augmented reality<br />
markers which would<br />
give instructions for<br />
games when scanned by a<br />
smartphone.<br />
Said district council<br />
property and commercial<br />
manager Douglas<br />
Marshall: “Investigations<br />
completed by the geotechnical<br />
engineer<br />
engaged by the council<br />
have indicated that parts<br />
of the playground site had<br />
historically been filled<br />
with poor compaction,<br />
which was likely to have<br />
occurred some years ago<br />
when the land was used for<br />
agricultural purposes.”<br />
The land is currently<br />
being remediated. A<br />
geo-technical engineer<br />
advised the council that<br />
this issue is isolated to<br />
the playground area and<br />
does not affect nearby<br />
residential properties.<br />
The old playground<br />
equipment is being<br />
replaced with lighter<br />
BIG BILL:<br />
Levi Park<br />
playground in<br />
Rolleston is<br />
being rebuilt<br />
after poor soil<br />
caused the<br />
playground<br />
equipment to<br />
slump.<br />
equipment to prevent<br />
future slumping, Mr<br />
Marshall said.<br />
“The new playground<br />
equipment will be more<br />
suitable for the remediated<br />
site. Our thanks to nearby<br />
residents for their patience<br />
and support as we work<br />
to make Levi Park a<br />
safe playground for the<br />
community,” he said.<br />
Drainage work started in<br />
November and is expected<br />
to be completed at the end<br />
of the week.<br />
A new climbing<br />
structure being imported<br />
from Germany is expected<br />
to be installed at Levi Park<br />
in late May.<br />
The playground is likely<br />
to re-open in June.<br />
WHEN YOU BUY ANY<br />
2 V 500mL CANS<br />
See instore for details.<br />
NEW<br />
PRODUCT<br />
Snax Crunches<br />
160g<br />
$<br />
1 99 ea<br />
The Natural<br />
Confectionery<br />
Company 200-260g<br />
$<br />
2 59 ea<br />
Lindauer 750ml<br />
(excludes Reserve)<br />
$<br />
9 99 ea<br />
Tip Top Bakery<br />
Supersoft Bread<br />
700g<br />
$<br />
2 99 ea<br />
Fresh NZ<br />
Quality Mark<br />
Prime Beef Mince<br />
$<br />
10 99 kg<br />
Broccoli<br />
Product of New Zealand<br />
$<br />
1 49 ea<br />
www.foursquare.co.nz<br />
facebook.com/FourSquareNZ<br />
Specials available South Island only from Monday 4th <strong>March</strong> until Sunday 10th <strong>March</strong> <strong>2019</strong> or while<br />
stocks last. Wine and beer available at stores with an off licence. Wine and beer purchases restricted to<br />
persons aged 18 years old and over.