18.12.2012 Views

The Incinerator Guidebook: A Practical Guide for Selecting ... - SSWM

The Incinerator Guidebook: A Practical Guide for Selecting ... - SSWM

The Incinerator Guidebook: A Practical Guide for Selecting ... - SSWM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Elastee Inc.<br />

Model: Mediburn<br />

Fuel: Diesel<br />

Lifespan: 10 years<br />

Temperature range: 1000°C+<br />

Capacity: 18 kg/hr<br />

Estimated capital cost (USD): $20,000<br />

Installation requirements: 110/120V if electrical or diesel;<br />

level surface<br />

Contact: 1309 W Marin<br />

Carmi, IL 62821, USA<br />

Ph: 1‐618‐382‐2525<br />

elastic@elastec.com<br />

References from the field:<br />

http://www.path.org/files/TS_trt_alt_med_wst_disp.pdf<br />

Yayasan Dian Desa<br />

Model: DD‐Best<br />

Fuel: Biomass<br />

Lifespan: Not available<br />

Temperature range: 800°‐1300°C<br />

Capacity: 35 kg/hr<br />

Estimated capital cost (USD): $3,333<br />

Installation requirements: Not available<br />

Contact: Jl. Kaliurang Gg Jurug Sari IV/19PO BOX 19<br />

YKBSYogyakarta 55281<br />

Indonesia<br />

diandesa@ydd.org<br />

References from the field:<br />

http://technet21.org/fichiers_Word/IndonesiaMedWasteFin<br />

alReport.doc<br />

Saubatech<br />

Model: Macroburn 23B<br />

Fuel: Biomass<br />

Lifespan: 4 years<br />

Temperature range: Not available<br />

Capacity: Not available<br />

Estimated capital cost (USD): $5,585<br />

Installation requirements: 12 days to install<br />

Contact: PO Box 170<br />

Northriding, Johannesburg<br />

South Africa 6162<br />

Ph: 27‐11‐794‐8798<br />

References from the field: Not available<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!