21.05.2020 Views

2020 Summer Five Star Journal - Special Edition

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bond work continues as planned<br />

Construction, school and facility bond improvements move forward amid changes<br />

The presence of COVID-19 this spring across the state and metro area presented a number of<br />

challenges and changes including the end of in-person learning for students in <strong>Five</strong> <strong>Star</strong> Schools.<br />

While the district’s ongoing bond improvement program wasn’t free of the challenges presented<br />

by this new reality, construction and planning work was able to move forward.<br />

“It’s been a collaborative effort between our Construction and Facilities Design team and our<br />

architects and contractors to keep these important school improvements moving forward during<br />

these uncertain times,” said Adams 12 <strong>Five</strong> <strong>Star</strong> Schools Construction Manager Tim Dolezal. “I’m<br />

proud of our entire team for doing the necessary work to ensure the continued success of the<br />

district bond program.”<br />

Some of the new realities in construction projects include contractors wearing additional<br />

protective gear such as face coverings and maintaining adequate social distancing. The district has<br />

also closely monitored the potential for labor shortages and delays in the delivery of materials.<br />

FutureForward at Washington Square<br />

Construction on the new FutureForward at Washington Square career and technical education<br />

campus, which began in <strong>Summer</strong> 2019, continued at a steady pace in Spring <strong>2020</strong> with substantial<br />

completion of the nearly 50,000-square-foot building planned for early August.<br />

The new campus, located near 126th Avenue and Washington Street in Thornton, is scheduled to<br />

open in Fall <strong>2020</strong> and is expected to increase career and technical education (CTE) opportunities<br />

for district students by as much as 80 percent. More than 500 students were enrolled in programs<br />

at the new campus as of early May.<br />

The campus will offer existing district CTE programs such as construction trades, welding, an<br />

introductory diesel mechanic course and EMT training. Programming will expand to include<br />

criminal justice, forensic science and fire science programs as well as an advanced diesel mechanic<br />

program.<br />

34 | The <strong>Five</strong> <strong>Star</strong> <strong>Journal</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!