24.06.2021 Views

2021 Spring Bond Mailer English

  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1500 E. 128th Ave.<br />

Thornton, CO 80241<br />

COMMUNITY<br />

UPDATE<br />

SPRING<br />

<strong>2021</strong><br />

Find out what<br />

we’ve been up<br />

to this last year<br />

and what’s to<br />

come as we near<br />

the completion of<br />

our 2016 <strong>Bond</strong><br />

Program projects.<br />

Investing in every student, every<br />

school, every community<br />

Read about the new FutureForward at Washington Square Campus >><br />

www.adams12.org/bond


2020 Highlights<br />

Community Driven<br />

New Master Planning Process<br />

Completion and opening of<br />

FutureForward at Washington Square,<br />

the district’s second career and<br />

technical education campus.<br />

Kitchen renovation and modernization<br />

at Vantage Point High campus.<br />

Critical plumbing repair projects at six<br />

of the district’s older schools (Malley<br />

Drive, Leroy, Hillcrest, McElwain and<br />

Rocky Mountain elementary schools,<br />

The Studio School and Hulstrom K-8).<br />

Turf replacement project at North<br />

Stadium and new artificial surfaces<br />

at Horizon and Mountain Range high<br />

schools and Pathways Futures Center.<br />

Start of roof replacement/restoration<br />

projects including BEST Grant-funded<br />

roof replacement at Thornton Middle<br />

School.<br />

Completion of two-year renovation of<br />

district’s original career and technical<br />

education campus, FutureForward at<br />

Bollman.<br />

Even as the 2016 <strong>Bond</strong> Program begins to reach its<br />

final phases, work has started on a plan to address<br />

the next generation of district programming and<br />

facility needs.<br />

In <strong>Spring</strong> <strong>2021</strong>, the district launched work to develop<br />

a new programming and facility master<br />

plan. The plan will serve as a road map for the<br />

district to include, not only the maintenance and<br />

upkeep of existing schools and facilities, but also<br />

the need for new facilities to meet the educational<br />

needs of students.<br />

Creating a longer-term vision for our district<br />

schools and facilities through this plan will<br />

allow us to continue to address existing needs<br />

and provide educational space to support an<br />

ever-changing academic environment.<br />

- Pat Hamilton, Chief Operations Officer<br />

Adams 12 Five Star Schools<br />

A completed master plan is tentatively scheduled<br />

to be finished in early 2022. The finished plan could<br />

be used as a foundation for the Five Star Schools<br />

Board of Education to consider presenting future<br />

bond funding proposals to district voters.<br />

What’s Still Ahead: Summer <strong>2021</strong><br />

Final round of school interior renovation projections and safety upgrades<br />

(Coronado Hills, Meridian, Prairie Hills, Silver Creek and Stellar elementary<br />

schools, Silver Hills and Rocky Top middle schools, Mountain Range High<br />

School and Pathways Futures Center).<br />

Completion of $20 million, 100-mile<br />

district fiber network. Project will<br />

connect district schools and facilities<br />

on a district-managed network and<br />

meet the internet connectivity needs<br />

of the district for years to come.<br />

Playground improvement projects<br />

(Eagleview and Coyote Ridge<br />

elementary schools).<br />

Roof replacement/restoration projects<br />

at 10 district schools and facilities<br />

including a full roof replacement at<br />

Northglenn High School funded with<br />

a matching $1.7M state BEST Grant.<br />

Phase 1 of a $6 million renovation of<br />

Five Star Stadium including new<br />

bleachers, upgrades to stadium<br />

facilities and new front entry.<br />

Want to be part of the Master<br />

Plan creation process?<br />

Five Star Schools is looking for district parents and<br />

community members interested in joining its Long<br />

Range Planning and Advisory Committee (LRPAC) .<br />

GET MORE INFORMATION AND APPLY AT :<br />

www.adams12.org/committees<br />

As a parent with kids in three different Adams<br />

12 schools, I thought a district-wide committee<br />

would be the best use of my limited time to be<br />

involved with and contribute towards the future<br />

success for all students across the district.<br />

Having been on LRPAC for three years, I have<br />

seen many projects evolve from a need, to<br />

a plan, to an executed and positive result.<br />

The upcoming planning work for the next<br />

round of facility and infrastructure needs will<br />

be just as important.<br />

- Kim Schafer, LRPAC Member<br />

Promises<br />

Kept<br />

<strong>Bond</strong> work will complete in Summer 2022 with a final round of school roof replacement projects<br />

and any remaining bond-funded facility maintenance work. All projects outlined as part of the<br />

original bond plan will be completed as originally promised.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!