2021 Spring Bond Mailer English
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1500 E. 128th Ave.<br />
Thornton, CO 80241<br />
COMMUNITY<br />
UPDATE<br />
SPRING<br />
<strong>2021</strong><br />
Find out what<br />
we’ve been up<br />
to this last year<br />
and what’s to<br />
come as we near<br />
the completion of<br />
our 2016 <strong>Bond</strong><br />
Program projects.<br />
Investing in every student, every<br />
school, every community<br />
Read about the new FutureForward at Washington Square Campus >><br />
www.adams12.org/bond
2020 Highlights<br />
Community Driven<br />
New Master Planning Process<br />
Completion and opening of<br />
FutureForward at Washington Square,<br />
the district’s second career and<br />
technical education campus.<br />
Kitchen renovation and modernization<br />
at Vantage Point High campus.<br />
Critical plumbing repair projects at six<br />
of the district’s older schools (Malley<br />
Drive, Leroy, Hillcrest, McElwain and<br />
Rocky Mountain elementary schools,<br />
The Studio School and Hulstrom K-8).<br />
Turf replacement project at North<br />
Stadium and new artificial surfaces<br />
at Horizon and Mountain Range high<br />
schools and Pathways Futures Center.<br />
Start of roof replacement/restoration<br />
projects including BEST Grant-funded<br />
roof replacement at Thornton Middle<br />
School.<br />
Completion of two-year renovation of<br />
district’s original career and technical<br />
education campus, FutureForward at<br />
Bollman.<br />
Even as the 2016 <strong>Bond</strong> Program begins to reach its<br />
final phases, work has started on a plan to address<br />
the next generation of district programming and<br />
facility needs.<br />
In <strong>Spring</strong> <strong>2021</strong>, the district launched work to develop<br />
a new programming and facility master<br />
plan. The plan will serve as a road map for the<br />
district to include, not only the maintenance and<br />
upkeep of existing schools and facilities, but also<br />
the need for new facilities to meet the educational<br />
needs of students.<br />
Creating a longer-term vision for our district<br />
schools and facilities through this plan will<br />
allow us to continue to address existing needs<br />
and provide educational space to support an<br />
ever-changing academic environment.<br />
- Pat Hamilton, Chief Operations Officer<br />
Adams 12 Five Star Schools<br />
A completed master plan is tentatively scheduled<br />
to be finished in early 2022. The finished plan could<br />
be used as a foundation for the Five Star Schools<br />
Board of Education to consider presenting future<br />
bond funding proposals to district voters.<br />
What’s Still Ahead: Summer <strong>2021</strong><br />
Final round of school interior renovation projections and safety upgrades<br />
(Coronado Hills, Meridian, Prairie Hills, Silver Creek and Stellar elementary<br />
schools, Silver Hills and Rocky Top middle schools, Mountain Range High<br />
School and Pathways Futures Center).<br />
Completion of $20 million, 100-mile<br />
district fiber network. Project will<br />
connect district schools and facilities<br />
on a district-managed network and<br />
meet the internet connectivity needs<br />
of the district for years to come.<br />
Playground improvement projects<br />
(Eagleview and Coyote Ridge<br />
elementary schools).<br />
Roof replacement/restoration projects<br />
at 10 district schools and facilities<br />
including a full roof replacement at<br />
Northglenn High School funded with<br />
a matching $1.7M state BEST Grant.<br />
Phase 1 of a $6 million renovation of<br />
Five Star Stadium including new<br />
bleachers, upgrades to stadium<br />
facilities and new front entry.<br />
Want to be part of the Master<br />
Plan creation process?<br />
Five Star Schools is looking for district parents and<br />
community members interested in joining its Long<br />
Range Planning and Advisory Committee (LRPAC) .<br />
GET MORE INFORMATION AND APPLY AT :<br />
www.adams12.org/committees<br />
As a parent with kids in three different Adams<br />
12 schools, I thought a district-wide committee<br />
would be the best use of my limited time to be<br />
involved with and contribute towards the future<br />
success for all students across the district.<br />
Having been on LRPAC for three years, I have<br />
seen many projects evolve from a need, to<br />
a plan, to an executed and positive result.<br />
The upcoming planning work for the next<br />
round of facility and infrastructure needs will<br />
be just as important.<br />
- Kim Schafer, LRPAC Member<br />
Promises<br />
Kept<br />
<strong>Bond</strong> work will complete in Summer 2022 with a final round of school roof replacement projects<br />
and any remaining bond-funded facility maintenance work. All projects outlined as part of the<br />
original bond plan will be completed as originally promised.