3.3 Minutes of <strong>the</strong> first evaluati<strong>on</strong> meeting <strong>CECED</strong> DW Ringtest<br />

• It was questi<strong>on</strong>ed if drying tests in lab 11 were d<strong>on</strong>e in parallel to<br />

<strong>the</strong> cleaning performance test (A: Lab 11 testify)<br />

• On drying, results of machine H are spread around 3 energy label<br />

classes while machine L covers 2 classes. (C)<br />

• A statistical outlier test should be d<strong>on</strong>e <strong>on</strong> all relevant data (indices).<br />

(A: Uni B<strong>on</strong>n)<br />

• <str<strong>on</strong>g>Report</str<strong>on</strong>g> (if not jet d<strong>on</strong>e) type and serial number of Memmert or<br />

o<strong>the</strong>r oven used and kind of shelf used to place <strong>the</strong> dishes (A: all)<br />

• The questi<strong>on</strong>naire should be returned not later than end of July<br />

(A: all, if not jet d<strong>on</strong>e)<br />

• <str<strong>on</strong>g>Report</str<strong>on</strong>g> about energy measuring equipment use: report type and<br />

producer and if it is fulfilling IEC 61036 class 1 requirements (A:<br />

all)<br />

• Temperature graphs for all cycles should be sent (A: all). AEG<br />

(Steiner) and BSH (Beer) will check and compare with <strong>the</strong>ir experience<br />

• Photographs of all crockery articles used should be sent (A: all)<br />

• As evidence is reported that <strong>the</strong> surface of porcelain is changing,<br />

it is proposed to use <strong>the</strong> crockery <strong>on</strong>ly after <strong>the</strong> 10th run. More<br />

evidence has to be given! (S)<br />

• For clarificati<strong>on</strong> it should be made clear, that <strong>the</strong> drying procedure<br />

in <strong>the</strong> oven should be 2 hours after closing <strong>the</strong> door of <strong>the</strong> oven (S)<br />

• A last call should be tried to include missing test labs, especially<br />

from Scandinavia. (A: Uni B<strong>on</strong>n)<br />

• DWs having finished testing should be sent back to Uni B<strong>on</strong>n. AEG<br />

volunteered to re-test <strong>the</strong>ir machines. BSH has no chance due to<br />

too much o<strong>the</strong>r work. Ano<strong>the</strong>r soluti<strong>on</strong> to verify should be found<br />

(A: Beer)<br />

• It was agreed not to distribute <strong>the</strong> data shown at <strong>the</strong> meeting, but<br />

to keep <strong>the</strong>m c<strong>on</strong>fidential up to <strong>the</strong> next meeting, which was agreed<br />

to be at <strong>the</strong> 24th of September 2003 (in B<strong>on</strong>n).<br />

For <strong>the</strong> presentati<strong>on</strong> of Mr. Beer at <strong>the</strong> EEDAL c<strong>on</strong>ference following<br />

messages from <strong>the</strong> ring-test were agreed:<br />

• energy measurement is not too bad in reproducibility<br />

• cleaning and drying performance need improvement in uncertainty<br />

• within <strong>on</strong>e lab, <strong>the</strong> ranking stays always <strong>the</strong> same, but absolute<br />

values may be misleading<br />

• reproducibility of <strong>the</strong> testing method must be improved or outliers<br />

(and <strong>the</strong> reas<strong>on</strong> for being outlier) identified<br />

• regular ring-tests are needed (at least all two years) to verify <strong>the</strong><br />

comparability of <strong>the</strong> procedures in all labs.<br />