16.12.2020 Views

COVID-19 (Temporary Measures) (Control Order)

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

31<br />

S 254/2020<br />

(b) includes any managerial or administrative work in<br />

connection with that sort of preventive, predictive<br />

and breakdown maintenance of plant equipment,<br />

but excludes construction work, building elements supply<br />

work, related work and renovation work;<br />

“process maintenance worker” means a permitted enterprise<br />

worker employed or engaged to perform process<br />

maintenance work;<br />

“related work” includes any of the following work and any<br />

managerial or administrative work in connection with related<br />

work:<br />

(a) dredging and land reclamation works, marine piling<br />

and the construction of marine structures such as<br />

jetties, wharves, sea and river wall;<br />

(b) landscaping;<br />

(c) road works;<br />

(d) laying underground cable or pipes for<br />

telecommunication systems or installations;<br />

(e) testing or maintenance work in connection with a<br />

building;<br />

(f) assembly or disassembly of fixed plant not requiring<br />

building plans approval or a permit to carry out<br />

structural works to be granted under the Building<br />

<strong>Control</strong> Act before starting;<br />

(g) specialised installation activities, such as installation<br />

of integrated signposting systems, cold rooms and<br />

ventilation systems, fire alarms, fire prevention and<br />

fire protection systems, and installation of<br />

mechanical plant, machinery, power generators and<br />

turbines systems;<br />

(h) corrosion protection works;<br />

(i) wiring work within a building for telecommunication<br />

purposes;<br />

Informal Consolidation – version in force from 2/6/2020

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!