Blyth and Cramlington District Heat Network Programme<br />
February<br />
<strong>2021</strong><br />
April<br />
<strong>2021</strong><br />
July<br />
<strong>2021</strong><br />
October<br />
<strong>2021</strong><br />
January<br />
2022<br />
April<br />
2022<br />
2022<br />
-2024<br />
Secure<br />
Funding for<br />
Techno-economic<br />
Feasibility<br />
Appoint<br />
Consultants<br />
Conclude<br />
Techno-economic<br />
Feasibility Study<br />
Commercialisation<br />
Complete<br />
Commercialisation<br />
Construction<br />
Complete<br />
Commercialisation<br />
Confirm funding<br />
for full technical<br />
feasibility and<br />
design<br />
Conclude<br />
procurement<br />
exercise<br />
Final technical<br />
feasibility and<br />
design work<br />
completed<br />
Awarded<br />
funding for<br />
Commercialisation<br />
Have contract<br />
principles agreed<br />
with key parties<br />
and signed off<br />
Heads of Terms<br />
Confirmation of<br />
capital funding for<br />
heat network<br />
phase 1 to be<br />
installed<br />
Construction to be<br />
undertaken on<br />
energy centre and<br />
phase 1 of network<br />
ACTIVITIES<br />
Commence<br />
procurement of<br />
lead design<br />
consultants<br />
Support the work<br />
through<br />
engagement with<br />
key stakeholders<br />
Confirm appointed<br />
consultants and<br />
kick off technoeconomic<br />
feasibility study<br />
Confirm required<br />
permissions; Coal<br />
Authority,<br />
Planning,<br />
Environment<br />
Agency, Land<br />
Owners<br />
Confirm funding<br />
routes, ownership<br />
model, key<br />
stakeholders and<br />
interlink with<br />
complementary<br />
programmes<br />
Commencement<br />
of procurement<br />
to appoint<br />
consultants<br />
required<br />
Apply for <strong>plan</strong>ning<br />
permission on<br />
preferred option<br />
for capital works<br />
Commence Green<br />
Heat Networks<br />
Application<br />
Procurement for<br />
installation<br />
contractor to<br />
commence<br />
Consideration off<br />
additional phases<br />
and requests for<br />
further funding to<br />
be developed<br />
Inter<strong>action</strong> with<br />
wider regeneration<br />
projects and<br />
linkages made<br />
wherever possible<br />
Apply to HNDU for<br />
Commercialisation<br />
to cement funding<br />
routes, permissions<br />
and rights into<br />
contracts<br />
Ongoing public<br />
and stakeholder<br />
engagement<br />
Figure 12 - draft timeline for progress with the Blyth and Cramlington district heat networks.<br />
NB this is subject to <strong>change</strong> as the project develops<br />
<strong>Climate</strong> Change Action Plan <strong>2021</strong>-<strong>23</strong> 31