23.12.2012 Views

Design, specification and constrcution of multi-use ... - Sport England

Design, specification and constrcution of multi-use ... - Sport England

Design, specification and constrcution of multi-use ... - Sport England

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

welded flats mounted to line posts <strong>and</strong> steel section angle support rails.<br />

Mesh shall be taken behind kick boards / rebound boards <strong>and</strong> attached<br />

to prevent h<strong>and</strong> traps.<br />

2.04 Floodlighting<br />

2.04.1 <strong>Design</strong> criteria<br />

The Contractor shall design supply <strong>and</strong> install a floodlighting system to<br />

the MUGA to meet the requirements set out in Appendix A, Tables 1 to 5<br />

as appropriate <strong>and</strong> in full compliance with the planning approval for the<br />

facility.<br />

The works shall include the provision <strong>of</strong> all luminaries, columns, mains<br />

distribution switch gear, sub-circuit protective devices, metering <strong>and</strong><br />

control devices <strong>and</strong> the associated cabling, trenching, ducting & draw pit<br />

installation, back filling <strong>and</strong> making good.<br />

All works shall be carried out in accordance with the latest edition <strong>of</strong> the<br />

IEE wiring regulations.<br />

For courts, the illumination st<strong>and</strong>ard is applied to the individual<br />

Principle Play Areas within the MUGA<br />

For pitches the illumination st<strong>and</strong>ard applies to the Principle Play Area<br />

<strong>of</strong> the pitch.<br />

The following st<strong>and</strong>ards shall apply to all lighting designs<br />

Property Requirement<br />

Overall minimum maintenance<br />

factor<br />

0.80<br />

Glare rating (Gr) 65<br />

Colour temperature (K) > 4000<br />

2.04.2 Column bases<br />

The Contractor shall take full account <strong>of</strong> the ground conditions, as<br />

detailed in the ground investigation survey report, when designing the<br />

bases for the floodlighting columns.<br />

24<br />

For info or comments please email mugas@sportengl<strong>and</strong>.org

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!