possible, accord with play lines <strong>and</strong> be longitudinal along the length <strong>of</strong><br />

the court(s) with no discernible cross-joints.<br />

A1.2.2 Colour coating<br />

Non-pigmented macadam shall be coloured with proprietary water<br />

based polyurethane textured court paints. The Contractor’s Proposals<br />

shall include colour swatches <strong>of</strong> the paint to allow approval <strong>of</strong> the<br />

proposed colours by the Employer. A minimum <strong>of</strong> two coats <strong>of</strong> paint<br />

shall be applied in transverse directions to provide a uniform<br />

appearance. The quality <strong>of</strong> the paints shall ensure that there are no<br />

significant signs <strong>of</strong> fading, flaking or cracking for a period <strong>of</strong> three years.<br />

A1.2.3 Line Marking<br />

Line markings shall be in accordance with the relevant sports governing<br />

body rules. Unless stated in the rules all lines shall be 50mm wide <strong>and</strong><br />

applied using at least two coats <strong>of</strong> paint. When measured with a<br />

calibrated steel tape all line markings shall be within 20mm <strong>of</strong> their true<br />

position as specified in the appropriate rule. Markings shall not deviate<br />

by more than 10mm from a line joining their ends, nor include any<br />

sudden steps. Line edges shall be parallel <strong>and</strong> uniform.<br />

A1.3 Floodlighting<br />

The minimum performance <strong>of</strong> the floodlighting system shall be as<br />

follows:<br />

Property Requirement<br />

Maintained average illuminance<br />

(PPA)<br />

> 400 Lux<br />

Uniformity (Min/Ave) >0.7<br />

Illumination st<strong>and</strong>ards shall be based on measurements taken after<br />

dark at ground level.<br />

A1.4 Testing on completion<br />

For all projects where the total area <strong>of</strong> the MUGA or MUGAs exceeds<br />

1500m 2 the facility shall be tested as detailed in the following schedule.<br />

36<br />