<strong>and</strong> a mixture <strong>of</strong> Chewing Fescue Highlight 20% or equivalent <strong>and</strong><br />

Majestic Perennial Rye Grass 80% shall be sown at a rate <strong>of</strong> 28g/m <strong>and</strong><br />

worked into the soil by harrowing or raking as appropriate. Following<br />

seeding the ground shall be lightly flat rolled until the surface is firm <strong>and</strong><br />

then watered. The Contractor shall retain responsibility for watering the<br />

ground, as required to establish the sward, until h<strong>and</strong>over.<br />

2.07 Testing<br />

2.07.1 MUGA / STP<br />

On completion <strong>of</strong> the works the MUGA shall be evaluated for compliance<br />

with the performance requirements as detailed in Appendix A.<br />

Practical Completion shall not be deemed to have been achieved until<br />

the Test Ho<strong>use</strong> confirms to the Employer the satisfactory performance <strong>of</strong><br />

the facility.<br />

2.07.2 Floodlighting<br />

In addition to the electrical tests associated with the electrical<br />

installation illumination tests shall be carried out, after dark, on the<br />

MUGA / STP to establish the specified illumination levels have been<br />

achieved. These tests shall establish the initial level(s) <strong>of</strong> illuminance<br />

<strong>and</strong> uniformity <strong>and</strong> shall be related to the maintained levels specified.<br />

Practical Completion shall not be deemed to have been achieved until<br />

the tests confirm the satisfactory performance <strong>of</strong> the facility.<br />

Measurements for courts shall be carried out on each court within the<br />

MUGA.<br />

Measurements for pitches shall be made on a 10m grid <strong>of</strong>fset from the<br />

centre spot <strong>of</strong> the pitch. The grid shall be identified by temporary disc<br />

type markers over the whole pitch area to ensure comparable readings<br />

are taken at ground level for full, reduced <strong>and</strong> part pitch lighting levels.<br />

2.07.3 Test ho<strong>use</strong>s<br />

Testing <strong>of</strong> the MUGA should be undertaken by a test ho<strong>use</strong> that is:<br />

(1) Accredited by the United Kingdom Accreditation Service (UKAS)<br />

or other recognised accreditation services or the relevant sports<br />

governing body.<br />

(2) A member <strong>of</strong> SAPCA’s Pr<strong>of</strong>essional Services Group.<br />

28<br />

For info or comments please email mugas@sportengl<strong>and</strong>.org