<strong>and</strong> a mixture <strong>of</strong> Chewing Fescue Highlight 20% or equivalent <strong>and</strong><br />
Majestic Perennial Rye Grass 80% shall be sown at a rate <strong>of</strong> 28g/m <strong>and</strong><br />
worked into the soil by harrowing or raking as appropriate. Following<br />
seeding the ground shall be lightly flat rolled until the surface is firm <strong>and</strong><br />
then watered. The Contractor shall retain responsibility for watering the<br />
ground, as required to establish the sward, until h<strong>and</strong>over.<br />
2.07 Testing<br />
2.07.1 MUGA / STP<br />
On completion <strong>of</strong> the works the MUGA shall be evaluated for compliance<br />
with the performance requirements as detailed in Appendix A.<br />
Practical Completion shall not be deemed to have been achieved until<br />
the Test Ho<strong>use</strong> confirms to the Employer the satisfactory performance <strong>of</strong><br />
the facility.<br />
2.07.2 Floodlighting<br />
In addition to the electrical tests associated with the electrical<br />
installation illumination tests shall be carried out, after dark, on the<br />
MUGA / STP to establish the specified illumination levels have been<br />
achieved. These tests shall establish the initial level(s) <strong>of</strong> illuminance<br />
<strong>and</strong> uniformity <strong>and</strong> shall be related to the maintained levels specified.<br />
Practical Completion shall not be deemed to have been achieved until<br />
the tests confirm the satisfactory performance <strong>of</strong> the facility.<br />
Measurements for courts shall be carried out on each court within the<br />
MUGA.<br />
Measurements for pitches shall be made on a 10m grid <strong>of</strong>fset from the<br />
centre spot <strong>of</strong> the pitch. The grid shall be identified by temporary disc<br />
type markers over the whole pitch area to ensure comparable readings<br />
are taken at ground level for full, reduced <strong>and</strong> part pitch lighting levels.<br />
2.07.3 Test ho<strong>use</strong>s<br />
Testing <strong>of</strong> the MUGA should be undertaken by a test ho<strong>use</strong> that is:<br />
(1) Accredited by the United Kingdom Accreditation Service (UKAS)<br />
or other recognised accreditation services or the relevant sports<br />
governing body.<br />
(2) A member <strong>of</strong> SAPCA’s Pr<strong>of</strong>essional Services Group.<br />