23.12.2012 Views

Design, specification and constrcution of multi-use ... - Sport England

Design, specification and constrcution of multi-use ... - Sport England

Design, specification and constrcution of multi-use ... - Sport England

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

locations including all court colours.<br />

Tests shall be made under wet conditions<br />

Permeability The permeability rate <strong>of</strong> the surface shall<br />

be determined in not less than two<br />

locations.<br />

Regularity The entire area shall be assessed.<br />

Gradients The principal gradients <strong>of</strong> the MUGA shall<br />

be measured <strong>and</strong> the design levels<br />

calculated.<br />

Levels Levels shall be taken on a 10m grid to<br />

determine deviation from design level<br />

Floodlighting A total <strong>of</strong> fifteen readings per netball court<br />

shall be taken on the PPA.<br />

A3.4 Warranty<br />

The Contractor shall provide a written warranty that the properties<br />

<strong>of</strong> the combined surface <strong>and</strong> foundation construction shall be<br />

retained within the limits given in this document for a period <strong>of</strong><br />

three years or throughout the period stated in this document,<br />

whichever is greater, subject to correct maintenance <strong>and</strong> the<br />

stated patterns <strong>of</strong> usage.<br />

46<br />

For info or comments please email mugas@sportengl<strong>and</strong>.org

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!