Design, specification and constrcution of multi-use ... - Sport England
Design, specification and constrcution of multi-use ... - Sport England
Design, specification and constrcution of multi-use ... - Sport England
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
locations including all court colours.<br />
Tests shall be made under wet conditions<br />
Permeability The permeability rate <strong>of</strong> the surface shall<br />
be determined in not less than two<br />
locations.<br />
Regularity The entire area shall be assessed.<br />
Gradients The principal gradients <strong>of</strong> the MUGA shall<br />
be measured <strong>and</strong> the design levels<br />
calculated.<br />
Levels Levels shall be taken on a 10m grid to<br />
determine deviation from design level<br />
Floodlighting A total <strong>of</strong> fifteen readings per netball court<br />
shall be taken on the PPA.<br />
A3.4 Warranty<br />
The Contractor shall provide a written warranty that the properties<br />
<strong>of</strong> the combined surface <strong>and</strong> foundation construction shall be<br />
retained within the limits given in this document for a period <strong>of</strong><br />
three years or throughout the period stated in this document,<br />
whichever is greater, subject to correct maintenance <strong>and</strong> the<br />
stated patterns <strong>of</strong> usage.<br />
46<br />
For info or comments please email mugas@sportengl<strong>and</strong>.org