MOMENTUMACE SDN BHD
D’Vervain Residences @ Central Park, Damansara, Petaling Jaya, Selangor, Malaysia.
PROJECT REF. 0321-7148
CLASSIFICATION Serviced Apartment
STAGE OF PROJECT Structural
LOCATION Lots PT50934 - PT50935
(HSD 321516-321517), PT51550
(HSD 321459), PT51551
(HSD 321460), PT51552
(HSD 321518), and Lot 84846
(PN 116648), Jalan PJU 8/8,
Mukim Sungai Buloh,
Daerah Petaling, Selangor,
Malaysia.
(GPS Coordinates: 3.174218, 101.616599)
APPROX. PROJECT COST >RM100 million
APPROX. COMMENCEMENT DATE 1Q 2020
APPROX. COMPLETION DATE 2024
DEVELOPER
Momentumace Sdn Bhd
(A member of Exsim Group)
Tel: +603-8993 9911
E-mail: info@exsim.com.my
Web: https://exsim.com.my/
Managing Director: Mr Lim Aik Hoe
ARCHITECT
Ping Ng Architect
Tel: +603-7733 4889
E-mail: pingngarchitect@gmail.com
Web: https://pingngarchitect.com/
Principal: Ar Ng Ping Ping
C & S ENGINEER
Jurutera Perunding Prestasi Rekabina Sdn Bhd
Tel: +603-8051 3535
E-mail: jpprsb@gmail.com
Engineer: Mr Tang Kee Chong
M & E ENGINEER
LMC Consult Sdn Bhd
Tel: +603-7725 7018
E-mail: lmc03sb@gmail.com
Web: https://lmcconsult.business.site/
Engineer: Ir Moo Sze Foo
QUANTITY SURVEYOR
SC QS Consult Sdn Bhd
Tel: +603-8023 8812 / 1355
E-mail: scqs21@scqsconsult.com
Director: Mr Chris Chew
MAIN CONTRACTOR
Binastra Construction (M) Sdn Bhd
(A subsidiary of Binastra Land)
Tel: +603-8998 7666 / 7555
E-mail: sales@binastra.com.my
Web: https://binastra.com.my
BRIEF DESCRIPTION
Proposed development is situated on a
2.78 acres of leashold land parcel within Central
Park Damansara project. It comprises two
blocks of 36-storey residential towers that sits
on a 8-storey carpark podium. It offers a total
of 1,066 serviced apartment units with built-up
areas of 550 sq ft, 900 sq ft and 1,100 sq ft
(2 - 4 bedrooms). It has one floor furnished
with various facilities including basketball court,
swimming pool, playground, outback grill,
tranquil pavilion, and etc.
The estimated GDV of Central Park
Damansara will be RM9 billion; the entire
masterplan is expected to take 8 years to
complete.
July-August 2021 | www.b-i.biz 49