- Page 1 and 2: 2021 REVISION JANUARY 2021 STORMWAT
- Page 3 and 4: I. REGULATORY BACKGROUND INTRODUCTI
- Page 5 and 6: notice procedures: i. The applicant
- Page 7 and 8: A wide range of major soil types ar
- Page 9 and 10: existing BMPs that will be continue
- Page 11 and 12: · Emergency Medical Services: Deli
- Page 13 and 14: MINIMUM CONTROL MEASURES I. MCM-1 P
- Page 15 and 16: Responsible Parties: Public Works 6
- Page 17: Description: The City will continue
- Page 21 and 22: number of inspections completed. An
- Page 23 and 24: performed is documented and retaine
- Page 25 and 26: IX. MCM-5 POLLUTION PREVENTION AND
- Page 27 and 28: they are working properly. The perm
- Page 29 and 30: available for review by the TCEQ. A
- Page 31 and 32: · Storage yards, waste transfer st
- Page 33 and 34: RECORD KEEPING AND REPORTING The pu
- Page 35 and 36: The annual report must be submitted
- Page 37 and 38: APPENDIX A: Stormwater Outfall Map
- Page 40 and 41: APPENDIX B Stormwater Management Pr
- Page 43: TPDES General Permit No. TXR040366
- Page 47: TPDES General Permit No. TXR040366
- Page 51: TPDES General Permit No. TXR040366
- Page 55: TPDES General Permit No. TXR040366
- Page 59: TPDES General Permit No. TXR040366
- Page 63: TPDES General Permit No. TXR040366
- Page 67: TPDES General Permit No. TXR040366
- Page 71:
TPDES General Permit No. TXR040366
- Page 74 and 75:
ultimately disturb equal to or grea
- Page 76 and 77:
(CFR) §122.26(b)(14)(i)-(ix) and (
- Page 78 and 79:
the mean high water mark (MHWM) out
- Page 101 and 102:
1/2021 Stormwater ManagementPlan AP
- Page 103 and 104:
March 25, 2020 Texas Commission on
- Page 105 and 106:
Permittee meets the eligibility req
- Page 107 and 108:
MCM BMP Information Used Quantity U
- Page 109 and 110:
MCM BMP Information Used Quantity U
- Page 111 and 112:
Description of bacteria-focused BMP
- Page 113 and 114:
Continue documenting each call and
- Page 115 and 116:
4 21 5 22 Addition of a Stormwater
- Page 117 and 118:
Name and Explanation: Name and Expl
- Page 119 and 120:
If you have questions on how to fil
- Page 122:
4 Animal Waste Ordinance Enforce ex
- Page 126:
MCM 3: Construction Site Stormwater
- Page 130:
MCM 5: Pollution Prevention and Goo
- Page 134 and 135:
March 31, 2021 Texas Commission on
- Page 136 and 137:
A. General Information Phase II (Sm
- Page 138 and 139:
MCM BMP Information Used Quantity U
- Page 140 and 141:
MCM BMP Information Used Quantity U
- Page 142 and 143:
C. Stormwater Data Summary Provide
- Page 144 and 145:
MCM(s) BMP Stormwater Activity Desc
- Page 146 and 147:
2 9 2 10 2 11 Nuisance Abatement Or
- Page 148 and 149:
Continue enforcement of the ordinan
- Page 150 and 151:
Note: If changes include additions
- Page 152 and 153:
I certify under penalty of law that
- Page 155:
4 Animal Waste Ordinance Enforce ex
- Page 159:
MCM 3: Construction Site Stormwater
- Page 163:
MCM 4: Post-Construction Stormwater
- Page 167:
25 Employee Training Continue imple
- Page 189:
MCM 3: Construction Site Stormwater