Red Oak Stormwater Management Plan - Mar 2022
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
of a larger common plan of development, meets regulatory requirements. Sections 3.05.006,<br />
3.06.006, and 3.06.008 of the ordinance will be enforced to ensure the long-term operation and<br />
maintenance of structural stormwater control measures. Per Section 3.06.008 of the ordinance,<br />
periodic inspections of the stormwater management systems may occur to ensure the long-term<br />
operation and maintenance of structural controls.<br />
Measurable Goals: The City will continue enforcing the ordinance and issuing permits for<br />
applicants meeting all requirements of the ordinance. The following will be conducted on an<br />
annual basis. The City will document 100% of the number of permits issued and 100% of the<br />
number of inspections completed. The City will evaluatee 100% of citizen complaints and take<br />
enforcement actions for 100% of the cases where there is a violation of the ordinance annually.<br />
If it is determined that a violation has occurred, the City will prepare a written notice to the<br />
responsible person. If the violation is not cured after a maximum of ten days of the written notice,<br />
the City may take one or more of the actions listed in Section 3.06.009(b)(1) through (5) of the<br />
City’s “Post-Development <strong>Stormwater</strong> <strong>Management</strong> for New Development and <strong>Red</strong>evelopment”<br />
ordinance. 100% of the follow-up activities including enforcement will be documented and<br />
maintained by the City.<br />
Responsible Parties: Code Enforcement, Public Works<br />
21. ADDITION OF A STORMWATER SECTION TO THE CURRENT CITY OF RED OAK STORM<br />
DRAINAGE SYSTEMS AND STORM WATER MANAGEMENT MANUAL<br />
Description: The City’s Storm Drainage Systems and Storm Water <strong>Management</strong> Manual includes<br />
a section that defines appropriate BMPs for construction activities that have the potential to<br />
impact stormwater quality. It includes guidance on permanent stormwater BMPs. The <strong>Plan</strong><br />
Review Committee will maintain copies of the manual for distribution to construction operators,<br />
as necessary, during the building permit application process for new development or<br />
redevelopment activities meeting ordinance applicability.<br />
Measurable Goals: The City will review the section annually and update as necessary.<br />
Responsible Parties: Public Works, Community Development<br />
1/2021 <strong>Stormwater</strong> <strong>Management</strong><strong>Plan</strong> 22