Seiring Residensi @ Damaisuria, Shah Alam, Selangor, Malaysia.
PROJECT REF. 0821-7039
CLASSIFICATION Mixed Development
STAGE OF PROJECT Sitework
LOCATION PT 39002, (Dahulunya
Lot 85723), Jalan U6/98,
Seksyen U6, Shah Alam,
Selangor, Malaysia.
(GPS Coordinates: 3.150618,101.524188)
APPROX. PROJECT COST RM677 million
APPROX. COMMENCEMENT DATE 3Q 2019
APPROX. COMPLETION DATE 2023
DEVELOPER
NPO Builders Sdn Bhd
(A subsidiary of Titijaya Land berhad)
Tel: +603-8022 9999
E-mail: sales@titijaya.com.my
Web: https://titijaya.com.my/
Executive Director:
Ms Charmaine Lim Puay Fung
ARCHITECT
DMP Architects Sdn Bhd
Tel: +603-2282 4418
E-mail: dmp@dmp-kc.com.my
Web: www.dmparchitects.com.my
Principal: Ar Dr Jay Yeunh
C & S ENGINEER
Jurutera Perunding Alphareka Sdn Bhd
Tel: +603-8024 0842
E-mail: jparsb@gmail.com
Assoc. Director: Mr Bong Lieh Men
M & E ENGINEER
KWA Consults Sdn Bhd
Tel: +603-7887 6618
E-mail: info@kwa.com.my
Web: https://kwa.com.my/
Director: Ir Koh Wei Jin
QUANTITY SURVEYOR
Perunding Kos T & K Sdn Bhd
Tel: +603-6203 5113
E-mail: info@pkt.com.my
Web: www.quantitysurveyorsmalaysia.com
Director: Sr Khor Peh Sin
MAIN CONTRACTOR
To Be Appointed
BRIEF DESCRIPTION
Proposed development is Phase 1 of
Damaisuria, an integrated 46-acre township. It
consists of four serviced apartment towers with
1,318 units situated on a 7.6-acre of freehold
land. The units come in a variety of layouts
with built-up area of 668 – 972 sq ft ( two to
four bedrooms), and a choice of either Private
Suite or Sky Suite. Facilities available include a
rooftop deck and lounge, multipurpose room,
playground, pavilion, jogging track, reflexology
path, spice garden, yoga deck, sand pit, open
lawn, swimming pool, wading pool, BBQ corner,
a prayer room and gym, as well as a 1.85-acre
linear park that will be constructed in Phase 1.
Damaisuria comprises residential towers
with retail and commercial components that
will developed in 4 phases, with a gross
development value (GDV) of RM1.59bil. It is
slated for completion in 2034.
July-August 2022 | www.b-i.biz 47