Possible location of Caritas<br />
University Well Bore<br />
(A er Onuoha and Dim, 2017)<br />
Conceptual Depositional Model/Schematic Cross-section<br />
MITIGATION: Short-term<br />
Short term (3 days to 1 Week):<br />
Construction of a temporarily gas diverter, with a shut-in valve<br />
leading to a gas-lift hose.<br />
Once shut-in only for seconds, the ame will go out without oxygen,<br />
then the valve is immediately opened before gas build-up, then<br />
vented or tapped by mobile gas tankers. This can be constructed in<br />
Enugu<br />
Note that the increasing height of gas ow (as would be simulated<br />
in a well test, suggest increased downhole connectivity /<br />
overpressure and relatively major source)<br />
MITIGATION: Middle-term<br />
Middle-term (2 Week to 1 month):<br />
If the situation does not abate after 1 Week<br />
Quick Shallow Seismic acquisition and Processing (approximately 1000m depth)<br />
extending further away to look ahead laterally and vertically, to verify the structure and<br />
source of leak, which is possibly: Shallow Gas Pocket, Fractured/Coal Seam Methane,<br />
or Reservoir Gas.<br />
The type of gas (most likely methane) was not ascertained before the ame, and may<br />
be ascertained after ame is controlled using the diverter.<br />
Note that the increasing radius of ow gives an inference in the nature of the upper<br />
layer, suggesting weak upper cover and forced shut-in may lead to more problems.<br />
Measures currently being used, such as re service water hose, sand ll, etc., will not<br />
extinguish the re.<br />
Disclaimer: This is a quick look based on notes taken at site and reported as an initial mitigation proposal in the emergency.<br />
Orientations, azimuth and dips were estimated for situating an offset relief well, and benchmarks used.<br />