27.12.2012 Views

Natural Resource Damage Assessment: Methods and Cases

Natural Resource Damage Assessment: Methods and Cases

Natural Resource Damage Assessment: Methods and Cases

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1) Name <strong>and</strong> location of case: ______________________________________________________<br />

2) Under which statute(s) is(are) this case pursued? ___OPA ___CERCLA ___Other ( )<br />

define<br />

3) Trustees involved: ____________________________________________________________<br />

4) How many responsible parties are involved? #____<br />

5) When did the event/activity responsible for the injury begin? CY ______<br />

How long did it last? # months ______<br />

6) Event/activity was: ___ NPL site ___ Spill ___ Voluntary ___ Other ( ___ )<br />

describe<br />

7) What was the nature of the contamination? (Check each that applies)<br />

___ Petroleum ___ Hazardous substances ( ) ___ Other ( )<br />

describe describe<br />

8) What was the mass or volume of contaminant(s) released? _____________________________<br />

______________________________________________________________________________<br />

9) The duration (actual or expected) of the injury is (answer one): # months _______<br />

In perpetuity since CY _______<br />

10) What kinds of resources were injured? (Check each that applies)<br />

___ Groundwater ___ Surface water ___ Wetl<strong>and</strong> ___ Air ___ Fish<br />

___ Non-fish wildlife ___ Recreational area ___ Cultural resource ___ Other ( )<br />

describe<br />

11) What was the magnitude of the injury? (e.g. miles of stream damaged, # animals killed, volume<br />

groundwater contaminated) _________________________________________________________<br />

______________________________________________________________________________<br />

12) When was the pre-assessment screen performed? CY _______<br />

13) Was a NRDA done for this case? ___ yes ___ no (IF NOT YES, FORM IS DONE)<br />

14) When was the NRDA completed? CY _______<br />

15) Did you hire a consultant to assist with the damage assessment process? ____ yes ____no<br />

16) What was the total cost to your office of the NRDA (including fees)? $ ___________<br />

17) What total estimated damages emerged from your NRDA? $ ___________<br />

18) Many methods are available to determine damages. For this case, check each of the following<br />

methods that were used by your staff, another Trustee, or consultants hired by the Trustees:<br />

In-house<br />

Other Trustee<br />

Consultant(s)<br />

Do not know<br />

Not applicable<br />

Own valuation tool<br />

Benefits transfer<br />

DOI Type A<br />

computer models<br />

NOAA compensation<br />

formulas<br />

Appraisal method<br />

Factor-income<br />

analysis<br />

Market price analysis<br />

22<br />

Hedonic analysis<br />

Travel-cost analysis<br />

Averting behavior<br />

analysis<br />

Contingent valuation<br />

Conjoint analysis/<br />

contingent ranking<br />

Habitat equivalency<br />

analysis<br />

Other (specify):

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!