Bay Harbour: January 10, 2024
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
24 <strong>Bay</strong> <strong>Harbour</strong> News Wednesday <strong>January</strong> <strong>10</strong> <strong>2024</strong><br />
BROUGHAM ST<br />
GASSON ST<br />
BURLINGTON ST<br />
BRISBANE ST<br />
WALTHAM RD WALTHAM RD<br />
Construction Area<br />
Traffic Flow<br />
Upcoming Cable Work<br />
BROUGHAM ST<br />
WILSONS RD<br />
N<br />
Night works on SH76<br />
Brougham Street<br />
Waltham Road intersection<br />
Orion is installing new 66kV<br />
underground power cable<br />
across the intersection of<br />
Brougham Street and Waltham<br />
Road from Tuesday 9 <strong>January</strong><br />
until late <strong>January</strong>.<br />
Please expect delays and allow extra<br />
time for your journey. Thank you.<br />
For more info phone 0800 363 9898<br />
or visit haveyoursay.oriongroup.co.nz.<br />
To do this construction work safely, traffic<br />
management will be in place at night from<br />
6pm until 6am, Sunday night to Friday<br />
morning:<br />
• Brougham Street will have a lane open<br />
in each direction<br />
• No travel on Waltham Road across<br />
Brougham Street<br />
• Left in left out access only at Waltham<br />
Road and Brougham Street.<br />
The traffic management will change as work<br />
progresses. Follow all signs and instructions<br />
from our crew.<br />
We’re strengthening<br />
our electricity network