ameters in order to identify the<br />
ideal solution for each project. The<br />
Geothermal Division has been operative<br />
since January 2008, serving<br />
private, commercial and industrial<br />
sectors in new-building and refurbishment<br />
projects. After establishing<br />
requirements, soil constitution<br />
and a heat-source concept, completion<br />
of the geothermal installation<br />
can get underway. The end result<br />
is an effective system, from the<br />
tip of the probe all the way to the<br />
power outlets in the building.<br />
thRiftY timeS<br />
Reducing energy costs has become<br />
an ever-present concern.<br />
Whether in the media, the boardroom<br />
or at home, saving is certainly<br />
in fashion, especially given<br />
the all-pervasive economic crisis.<br />
Pair saving with environmental<br />
gain and you’ve hit the jackpot, as<br />
Wirtschaftsbetrieb Mainz did with<br />
its sewage treatment plant. The<br />
probe field there has been in operation<br />
since late 2009 – after just<br />
CREDENTIALS<br />
eight weeks of construction. The<br />
newly constructed administrative<br />
building required 33 bore holes at<br />
a depth of 150 metres each, with a<br />
total of 1,580 metres of connecting<br />
lines between probes and distributor<br />
shaft. These impressive figures<br />
only hint at the geological challenge<br />
that is the Mainz basin – a challenge<br />
tackled with enthusiasm by<br />
ALPINE-ENERGIE from the ground<br />
to the installations room. //<br />
The Styrian<br />
thermal-spring<br />
region, the<br />
Upper- and<br />
Lower-Austrian<br />
Molasse Basin<br />
and the Vienna<br />
Basin are all particularly<br />
well<br />
suited geologically<br />
to the harnessing<br />
of geothermal<br />
energy.<br />
ALPINE-ENERGIE’s expertise encompasses the most diverse applications, and it<br />
is driving sustainability on a variety of levels and dimensions, including efficient<br />
time management and regulatory know-how.<br />
TECHNICAL COLLEGE IN SAXONY-ANHALT The newly built canteen and<br />
auditorium reduce annual energy costs by half.<br />
MAINz SEWAGE TREATMENT PLANT The new administrative building<br />
was built in eight weeks despite challenging geological conditions.<br />
LINDLAR ACADEMY Lang AG’s new training facility was equipped with a<br />
total of 8,815 metres of probes.<br />
BETzENWEILER MULTIPURPOSE HALL This large-scale project benefits<br />
the municipality thanks to optimised running costs for energy.<br />