• Construct new bridges at 4 th Street and Trade Street to support platforms and station<br />

tracks<br />

Base Build features and construction elements included the following:<br />

• NCCR platform with canopies, lighting and ticket vending machines<br />

• Amtrak platforms<br />

• Stairwells and handicapped lifts to Trade and 4th to support NCCR platforms<br />

• Construct new bridges at 4 th Street and Trade Street to support platforms and station<br />

tracks<br />

• Artwork allowance at 1.0% of Construction<br />

Table 2.4-1 CGS Conceptual Cost Estimate Full Build Alternative<br />

<strong>CHARLOTTE</strong> <strong>GATEWAY</strong> <strong>STATION</strong> CONCEPTUAL COST ESTIMATE<br />

2006 2007 2012<br />

Construction Construction Construction<br />

Major Cost Element & Sub-Elements Cost Cost * Cost **<br />

CATS Bus Underground Terminal Alternative $ 12,821,000 $ 13,103,062 $ 15,941,878<br />

Bus Entry & Exit Ramps, Passenger Platforms<br />

Pedestrian Circulation: 3-Elevators, 2-Escalators,<br />

Sidewalk & Plaza Access Stairs, Canopy Allowance<br />

for Stairs & Escalators, Concrete Lid & Walls with<br />

Waterproofing & Finish, Mechanical Exhaust, Lighting<br />

Demolition of Existing Greyhound Building<br />

Haz Mat Add'l Survey, Design, Disposal & Treatment<br />

Sitework, Geotech, & Grading<br />

CATS Bus – Enhanced Street Access Alternative<br />

Curb cuts, canopies and enhancements at 4 th , Trade &<br />

Graham Streets $ 2,500,000 $ 2,555,000 $ 3,108,548<br />

CATS/AMTRAK Station Elements $ 18,129,000 $ 18,527,838 $ 22,541,948<br />

Great Hall, Entry Canopy, Ticketing, Waiting, Baggage<br />

Mezzanine Baggage & Operations, Waiting<br />

Interior Finishes, Mechanical/Electrical/Plumbing,<br />

Vert Circulation: 2-Stairs, 5-Elevators, 10-Escalators<br />

Retail Space Elements - Provided by Others<br />

Office Space Elements - Provided by Others<br />

Plaza Elements<br />

Graham St Plaza - Above Bus Terminal,<br />

Trade St & 4th St Access, Plaza Lighting,<br />

Plaza Fountains, 50% Hardscape, 50% Softscape<br />

$ 9,909,000 $ 10,126,998<br />

$<br />

12,321,0422<br />

Sidewalk Improvements (1,500' X 22') $ 184,000 $ 188,048 $ 228,789<br />

Charlotte Gateway Station 2.4-10<br />